Most viewed - Pilbara negative and digital Albums - Iron Ore |

235-01116 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train with second unit Goninan built CM39-8 unit 5630 'Zeus', notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new.
|
|

236-17116 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
|
|

239-22116 viewsOverview of Yandi One OHP plant as viewed from the head end of CV2 conveyor which runs from the primary crusher to the reclaim pile. Visible from the left is the screen house, radial stacker on the stockpile, power station, new and old side tertiary crushing structures, sub-station 4, the control room and on the extreme right the secondary crusher structure. GeoData.
|
|

239-29116 viewsYandi Two, conveyor belt CV202 failure to the belt on the primary crushing circuit. Shows belt rolls bunched up near exit from primary jaw type crusher. GeoData.
|
|

040805 095643116 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 734.
|
|

040806 091930116 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|

040806 102956116 viewsFlash Butt yard, heavily modified Magor USA built ex-Oroville Dam ore waggon 661, seen here modified for LocoTrol service and testing.
|
|

040814 091958116 viewsNelson Point, CFCLA ballast waggon CHQY type 730 just being delivered to BHP Iron Ore as part of the Rail PACE project, 3/4 view from handbrake end.
|
|

050518 2073116 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 741.
|
|

051001 5627116 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of handbrake end, pushed into earth bund.
|
|

051001 5639116 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam.
|
|

060429 3725116 viewsFlash Butt yard, Pony waggon #1, modified from a Magor USA built Oroville ore waggon, with a Comeng built gantry carrier.
|
|

071202 1232116 viewsTurner Siding, CFCLA flat waggon AQPY type AQPY 2916, also carrying BHP road number 6705, a 55 tonne capacity waggon.
|
|

050407 0382116 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|

050410 0510116 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

060501 3912116 viewsAbydos Siding backtrack, Speno rail grinder RG 2, first grinding module. 1st May 2006.
|
|

060501 3930116 viewsAbydos Siding backtrack, Speno rail grinder RG 2 coupled to RG 1. 1st May 2006.
|
|

150523 8216116 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0032, one of a second batch delivered in 2015 with safety slogan 'Start with safety'.
|
|

150523 8219116 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0024, one of a batch of ten built in 2014.
|
|

170730 0476116 viewsBoodarie, a loaded Roy Hill train crossing the Great Northern Highway grade crossing with mid-train General Electric built ES44ACi unit RHA 1011 serial 62583. 30th July 2017. GeoData.
|
|
3983 files on 200 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
76 |  |
 |
 |
 |
 |
 |
 |
|