Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
234-01.jpg
234-01286 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. As this series of rebuilds has no marker lights not the red lantern attached to the hand rail. Circa 1998.
040805_095732.jpg
040805 095732286 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 734.
050518_2081.jpg
050518 2081286 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 745.
051001_5693.jpg
051001 5693286 viewsBoodarie, the Steel Train or rail recovery and transport train, builders plate detail of waggon #15, 6206, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
060429_3761.jpg
060429 3761286 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining, builders plate for Scotts of Ipswich Qld with a 24th September 1970 build date, one of nine originally numbered 6005-6013.
040407_073240.jpg
040407 073240286 viewsGoldsworthy Junction, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper serial 153172, 7th April 2004.
050412_0820.jpg
050412 0820286 viewsAbydos Siding backtrack, front view of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
050917_5515.jpg
050917 5515286 viewsCoon Siding, view of the tamper operators cabin location on Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
150314_7752.jpg
150314 7752286 viewsBing Siding, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
170729_0289.jpg
170729 0289286 viewsMaitland Siding on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 will stay on the main as an empty train waits on the passing siding. 29th July 2017. GeoData.
241-11.jpg
241-11286 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs. June 2002.
080304_2181.jpg
080304 2181286 viewsThomas Yard, down the rail welding end, side view of control waggon 2342, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
250-16.jpg
250-16286 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 1550 hrs 21st October 2000.
252-06.jpg
252-06286 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7088 with serial number 47767 from the original 1994 build idles away on the eastern end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 02 is behind the locomotive. Location is roughly here. 24th November 2001.
267-24.jpg
267-24286 viewsGoldsworthy Junction, CM40-8M GE rebuild unit 5653 'Chiba' serial number 8412-10 / 93-144 trails sister unit 5634 as 5634 turns on the power as it passes Goldsworthy Junction relay room and continues along the Newman Mainline with the Sundowner Special. Friday 12th of April 2002.
218-25.jpg
218-25285 viewsDe Grey, Great Northern Highway grade crossing at the 57.15 km a loaded GML train with Gunderson USA (smooth) and Portec USA (ribbed) built waggon behind the C36-7M loco. The waggons are ex-Phelps Dodge Copper Mine.
226-04.jpg
226-04285 viewsYule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.
229-16.jpg
229-16285 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
229-33.jpg
229-33285 viewsYandi Two loadout exit side, as second unit 5642 'Wallareenya' serial 8281-07 / 92-131 a Goninan rebuild CM40-8M GE unit trails sister unit 5650 drag a loading train at 1.2 km/h around the loadout balloon, the waggon behind 5642 is an original Oroville waggon. GeoData.
234-05.jpg
234-05285 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of left hand side of cab. Circa 1998.
5972 files on 299 page(s) 77

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional