Most viewed - Pilbara negative and digital Albums - Iron Ore |

207-22668 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M unit 5513 serial 4839-02 / 88-078, cab front view.
|
|

040407 080337668 viewsToy Titan on the lean when the LHS rear wheel parted company and went bush. 23 km Newman mainline. Wednesday 7th April 2004.
|
|

242-07667 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5508 serial 4839-04 / 87-073 about to be trucked to United Goninan Perth for eventual overhaul and repainting into the Pilbara Rail livery and leased to Pilbara Rail re-numbered 5052 as a shunt unit at Dampier. May 2002.
|
|

050624 3348665 viewsGoldsworthy, view from the observation end of the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
|
|

050109 093234663 viewsPilbara Railways Historical Society, side view of 5450, a USA built EMD model F7A locomotive serial 8970, frame 3006-A9 built Jan-1950 for Western Pacific Railroad as 917-A, imported for the Mt Newman Mining Co. to construct their Port Hedland to Newman railway in December 1967. 9th October 2005.
|
|

040407 080551654 viewsTHE WHEEL NUUUTTSS!! Here we see Toy Titan in a spot of bother when the rear LHS wheel parted company at the 23 km Newman mainline. Was lucky to get out of it with so little damage! Wednesday 7th April 2004.
|
|

040419 102309652 viewsAbydos back track, riveted flat waggon 202 with three water tanks fitted, side view, shows access ladder profiles, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
|
|

180117 1148649 viewsGreat Northern Highway, 18 km grade crossing sees CFCLA Goninan ALCo to GE rebuild CM40-8M unit CD 4302 originally Robe River Comeng NSW built ALCo M636 serial C6103-1 #9421, rebuilt by Goninan in 1993 with serial 8297-2/93-137 then to CFCLA in 2012 powering a loaded fuel train as part of the mainline testing of these units prior to ore train service. 17th January 2018.
|
|

221-03643 viewsHardie Siding, with the days of Goninan GE rebuilt C36-7M units operating numbered, 5513 serial 88-078 / 4839-02 rebuilt from AE Goodwin ALCo C636 5453 serial G6012-2, the drivers side cab 'Kalgan' nameplate has already removed to be fitted to the new GE AC6000 6074.
|
|

150523 8204643 viewsNelson Point Yard, BHP Billiton SD70ACe unit 4368 is on the fuel tank shunt, is a unit from the last order of eighteen SD70ACe units for BHP Billiton built at Electro-Motive in London Ontario, serial 20098203-013.
|
|

160128 00394640 viewsWedgefield, Sims Metal yard, the ALCo remains of Goninan rebuild CM40-8ML (cabless, but cab fitted in 1996) 5664 serial 8412-09 / 94-155, the ALCo Hi-Ad bogies and fuel tanks of original ALCo M636 Comeng NSW built 5491 serial C6084-7.
|
|

150522 8189638 viewsWedgefield, Sims Metal yard, Goninan WA rebuild CM40-8M unit 5656 serial 8412-01/94-147 awaits the shears. Full details of this unit can be seen here .
|
|

160128 00385638 viewsWedgefield, Sims Metal yard, Goninan rebuild CM40-8M 5660 serial 8412-05/94-151 surrounded by remains and sibling units.
|
|

1062 001638 viewsWelshpool, Goninan, Mt Newman Mining's GE C36-7M rebuild unit 5509 serial 4839-05 / 87-074 being road hauled to Port Hedland by Bell on a ninety four wheel float. This unit was rebuild from AE Goodwin ALCo C636 unit 5452 serial G6012-1. May 1987.
Jim Bisdee photo.
|
|

040815 164638637 viewsNelson Point, CFCLA ballast waggon CHQY type 740 just being delivered to BHP Iron Ore as part of the Rail PACE project, 3/4 view from handbrake end.
|
|

150505 7948635 viewsFMG Solomon Line track - rail detail, H VT 136 RE PG4 2010 XII, H for head hardened, VT for vacuum degassing, the diamond logo PZH indicates it is manufactured by Pangang Group Steel Vanadium & Titanium Co. Ltd, is 136 pounds per yard weight, RE meets AREMA (American Railway Engineering and Maintenance-of-Way Association) standards, PG4 indicates tensile strength of 1300 MPa, and a rolled date of 2010, December.
|
|

041014 122600635 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th October 2004.
|
|

160128 00000633 viewsSee 5661 reduced to frame level in just over 7 minutes.
A 176 tonnes locomotive is no match for a 40 tonne CAT excavator with a T-Rex type hydraulic set of shears.
|
|

160128 00393633 viewsWedgefield, Sims Metal yard, General Electric V16 7FDL-16 prime mover from CM40-8M 5664.
|
|

160128 00413A632 viewsView of the stripped out cab - drivers console of Goninan built CM39-8 unit 5631, serial no. 5831-10, builders no. 88-080.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
8 |  |
 |
 |
 |
 |
 |
 |
 |
 |
|