Most viewed - Pilbara negative and digital Albums - Iron Ore |

6201 Comeng WA 051001 5722429 viewsBoodarie, the Steel Train or rail recovery and transport train flat waggon #28, 2nd lead off waggon 6201, built by Comeng WA in January 1977 under order no. 07-M-282 RY, with the Gemco built straddle crane.
|
|

6007 Scotts of Ipswich Qld 050522 2731429 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #21, 6007 with registered number G506007, built by Scotts of Ipswich Qld in 1970.
|
|

050410 0524429 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050411 0611429 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 runs along the Newman mainline towards Bing Siding. 11th April 2005.
|
|

050801 4721429 viewsNelson Point yard, ballast regulator BR 33 a Plasser Australia model SSP 302 unit serial M486. 1st August 2005.
|
|

050917 5506429 viewsCoon Siding, on the truncated passing siding following a derailment Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
|
|

0011 Comeng NSW 110411 10014429 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0011 from 1972, one of three such tank waggons.
|
|

170728 09819429 viewsWestern Creek, a disabled train from Mesa A on the right behind ES44ACi unit 9103 has relief locos 7082 serial 47761 a General Electric built Dash 9-44CW and a General Electric built ES44DCi unit 8137 ease up to couple onto 9103s disabled train. This image shows all these models of locomotive on the Rio Tinto mainline roster as an empty train climbs upgrade under the bridge. 28th July 2017. GeoData.
|
|

060723 7824429 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
|
|

IC20 070908 0596429 viewsRobe River compressor waggon set IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert yard August 8, 2007.
|
|

170510 8282429 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

171018 0956429 viewsTad Yard, overview of Roy Hill's fuel tanks and waggon loading gantry with a fuel train being loaded headed up by ES44ACi unit RHA 1020 serial number 64301 built in Erie Pennsylvania, USA by GE. 17th October 2018.
|
|

02396 080116 1372429 viewsChapman Siding 69 km, FMG master or control waggon 2396 tare 22.9 tonnes with bar coupling for the 'married' pair showing the train pipe, waggon control pipe and electrical jumper. Built by China Southern or CSR at their the Zhuzhou Rolling Stock Works in China in 2007, stands on the passing track. 16th January 2008.
|
|

246-17429 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

210322 9566429 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 124 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

240701 2796429 viewsPilbara Railways Historical Society museum, Simplex Dorman 0-4-0P model builders number 14033 built in 1957, locomotive originally numbered NW 12, renumbered to PW 22 in 1969. It was donated from the Public Works Department at Point Samson in 1976. A picture of it in service can be found here at Weston Langford site. July 1, 2024.
|
|

223-32428 viewsPossum Siding, a loaded train behind a pair of Hamersley Iron General Electric built Dash 9-44CW units 7072 serial 47751 and 7074 serial 47753 with the crew change completed, the empty is rolling past on the passing track. 21st October 2000.
|
|

224-09428 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.
|
|

228-05428 viewsYandi One, a loaded train creeps towards the Y308.1 km grade crossing while loading a train at 0.9 km/h. Goninan GE CM40-8MEFI rebuild unit 5667 'Redcar' serial 8412-12/94-158 leads an unidentified CM40-8 new build unit, either 5646 or 5647.
|
|

232-32428 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|
| 6217 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
82 |  |
 |
 |
 |
 |
 |
 |
|