Most viewed - Pilbara negative and digital Albums - Iron Ore |
226-0368 viewsYule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.
|
|
226-1968 viewsShaw North, 216.5 km, departure repeater signal post SWN 4R for the mainline is aimed across the 700 metre radius curve that north bound trains face. GeoData.
|
|
226-1868 viewsShaw North, 216.5 km, expanded view showing departure signals from left to right, SWN 4R repeater for SWN 4, SWN 4 for the mainline and SWN 6 for the loop, then SWN 6R on the far right. Loaded trains are about to descend the steep 1.5 percent decent to Garden Siding from this location. The interlocking room with solar array mounted above the cutting in the background with the arrival signal also visible. The repeaters are due to the 700 metre radius curve north bound trains round to approach this location. GeoData.
|
|
227-1068 viewsNelson Point, a view from the rear of A berth at the salt pile and stacker, this was operated by Cargill at the time of the photo. The under harbour tunnel portal is on the right. GeoData.
|
|
227-1168 viewsPort Hedland harbour control tower, the salt conveyor is at the bottom of the picture, the high building beyond the tower is the Esplanade Hotel, with the two story building to the right of the tower the Port Authority offices. GeoData.
|
|
231-1068 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|
231-1468 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650, note the missing logo from the hood and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
|
|
233-1068 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|
234-0768 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. As this series of rebuilds has no marker lights not the red lantern attached to the hand rail. Circa 1998.
|
|
234-1068 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of left hand side radiator section. Circa 1998.
|
|
234-1668 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of left hand side rear bogie. Circa 1998.
|
|
234-2268 viewsYandi Two, BHP Iron Ore Goninan rebuild CM39-8 GE unit 5630 'Zeus' serial 5831-09 / 88-079 is second unit on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. Rear three quarter view. Circa 1998.
|
|
238-2268 viewsNelson Point loco overhaul shop, former Union Pacific loco 3523 an EMD SD40-2 model, serial 786170-25 and now numbered 3085 for BHP Billiton Iron One service had only been in operation for eleven days when this shot was taken on the 27th November 2004. Geodata .
|
|
040806 09104668 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|
040912 14213468 viewsNelson Point, Silver Star observation coach, 'Sundowner', 3/4 view from rear end. Originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
|
|
050410 053668 viewsNelson Point, tanker filling area, fuel tank waggon 0018, a Comeng WA built 114 kilolitre tank waggon, one of a batch of three built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
|
|
050410 053768 viewsNelson Point, tanker filling area, fuel tank waggon 0018, a Comeng WA built 114 kilolitre tank waggon, one of a batch of three built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
|
|
050412 075268 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA waggon 534, originally in ore service before conversion to a ballast waggon.
|
|
050518 209268 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 747.
|
|
050518 213768 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 753, STB decal.
|
|
3610 files on 181 page(s) |
|
|
|
|
|
|
|
|
82 | |
|
|
|
|
|
|
|