Most viewed - Pilbara negative and digital Albums - Iron Ore |

080124 1621112 viewsChapman Siding, view looking north of a rake of new CSR Zhuzhou Rolling Stock Works China built waggons stabled in the passing track to free up yard room. 24th January 2008.
|
|

268-29112 viewsAt the 39 km detection site with the Alstom 25-year special, left hand side view of the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
|
|

268-34112 viewsAt the 39 km detection site with the Alstom 25-year special, view from the No. 1 End of the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
|
|

269-14112 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

220-24111 viewsGoldsworthy Junction, a loaded train from Yarrie mine lead by BHP Dash 7 unit 5507 'Nimingarra' serial 4839-03 / 87-072 was rebuilt by Goninan WA from an ALCo C636 unit 5461 into GE model C36-7M in 1987.
|
|

220-33111 viewsGoldsworthy Junction, an empty train rolls through the Junction on the Newman Mainline with mostly Comeng WA style built waggons and the odd Goninan one. This area is now fully duplicated.
|
|

221-27111 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.
|
|

226-14111 viewsShaw North, 216.5 km, expanded view with arrival signal SWN 3 Shaw North 3 which is at the top of the steep 1.5 percent climb that south bound empties face. Dragging equipment detection bars visible, they are painted yellow and the interlocking room with the north end points and the departure signals and repeater posts due to the large curve loaded trains face. GeoData.
|
|

229-0A111 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
|
|

229-11111 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.
|
|

230-04111 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
|
|

151111 9552111 viewsSide view of empty train led by General Electric ES44DCi units 8162 serial 60226 and 8167 serial 60231 both in the Rio Tinto tiger strip livery leading Dash 9-44CW 7093 serial 47772, the last of the original build of Dash 9 units at the 53 km.
|
|

231-11111 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

232-04111 viewsYandi Two, view west from near the 311.6 km grade crossing, train can be seen loading on the right. February 1997. GeoData.
|
|

235-14111 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 passes out the other side of the loadout tunnel as loading has commenced, the dust extraction equipment and retaining wall culvert frame the loco.
|
|

236-28111 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
|
|

236-36111 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6071 'Chichester' serial 51063 sits out the front with new windscreen protectors or 'blinkers' fitted, cab side and bogie view.
|
|

238-02111 viewsPort Hedland Harbour, bulk carrier Grande Solaris, call sign: 7JOW (IMO: 9254769) and built in 2003 by the Tsuneishi Tadotsu Factory, Tadotsu Japan is berthed at Finucane Island C Berth taking on iron ore. 1st November 2003. Geodata .
|
|

238-20111 viewsNelson Point loco overhaul shop sees former Southern Pacific loco 3079 EMD model SD40, serial number 7861-52 with the long hood removed due to the 645 prime mover failing not long after arrival in Australia. 27th January 2004. Geodata .
|
|

040806 092738111 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a test waggon.
|
|
3983 files on 200 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
84 |  |
 |
 |
 |
 |
 |
 |
|