Most viewed - Pilbara negative and digital Albums - Iron Ore |

226-17276 viewsShaw North, 216.5 km, departure signals SWN 4 for the mainline and SWN 6 for the loop for loaded trains that are about to descend the steep 1.5 percent decent to Garden Siding. Dragging equipment detection bars visible, they are painted yellow and the interlocking room with solar array mounted above the cutting. The signal on the top of the cutting on the right is SWN 6R the repeater post for SWN 6 due to the 700 metre radius curve north bound trains approach this location. GeoData.
|
|

226-36276 viewsShaw siding 219 km, 5654 'Kashima' serial 8412-11 / 93-145 is the trail or slave remote on the mid-train pair of units, note the large flat fuel tank indicating this unit was a Comeng NSW built ALCo before rebuild. GeoData.
|
|

228-03276 viewsWords fail this picture!
|
|

229-10276 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.
|
|

229-20276 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|

230-15276 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|

230-16276 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The ore stockpile and pedestal stacker are visible. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|

151111 9552276 viewsSide view of empty train led by General Electric ES44DCi units 8162 serial 60226 and 8167 serial 60231 both in the Rio Tinto tiger strip livery leading Dash 9-44CW 7093 serial 47772, the last of the original build of Dash 9 units at the 53 km.
|
|

231-07276 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

231-11276 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

231-15276 viewsYandi Two balloon loop, BHP Iron Ore 5650 'Yawata' serial 8412-09 / 93-141 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as second unit, note the logos are the original teal and marigold and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
|
|

231-18276 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

231-37276 viewsYandi Two balloon loop, BHP Iron Ore 5638 'Mallina' serial 8281-02 / 92-127 a Goninan WA rebuild CM40-8M GE unit is the lead remote mid-train unit as it loads a train at 1.2 km/h with second unit 5656, not the difference in the fuel tanks, 38 is rebuilt from an AE Goodwin NSW built C636 ALCo while 56 is rebuilt from a Comeng NSW built M636 ALCo. GeoData.
|
|

232-00276 viewsYandi Two crushing and screening plant, built and operated by Henry Walker for BHP Iron Ore, overview from the radial stacker feed conveyor. From the left is the primary crusher, the dual secondary crushers can be made out behind the tertiary crushers in the middle and the screenhouse is the large building tot he right, the conveyor leading to the right is CV210. February 1997. GeoData.
|
|

234-07276 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. As this series of rebuilds has no marker lights not the red lantern attached to the hand rail. Circa 1998.
|
|

238-15276 viewsNelson Point, ex Southern Pacific tunnel motor locomotive 8335 an EMD SD40T-2 unit, serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, purchased as a spare parts source for the other SD40 style units BHP Billiton purchased in 2003/04. 19th November 2003. Geodata .
|
|

239-22276 viewsOverview of Yandi One OHP plant as viewed from the head end of CV2 conveyor which runs from the primary crusher to the reclaim pile. Visible from the left is the screen house, radial stacker on the stockpile, power station, new and old side tertiary crushing structures, sub-station 4, the control room and on the extreme right the secondary crusher structure. GeoData.
|
|

040806 101910276 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, 3/4 view from handbrake end.
|
|

050518 2170276 viewsBing Siding. Side view of 1963 built Magor USA waggon 533, originally in ore service before conversion to a ballast waggon.
|
|

050518 2187276 viewsBing Siding. Side view of 1963 built Magor USA waggon 519, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|
5972 files on 299 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
89 |  |
 |
 |
 |
 |
 |
 |
|