Most viewed - Pilbara negative and digital Albums - Iron Ore |
![Filename=226-36.jpg
Filesize=304KiB
Dimensions=1280x850
Date added=Nov 13, 2015 226-36.jpg](albums/Pilbara/226/thumb_226-36.jpg)
226-3681 viewsShaw siding 219 km, 5654 'Kashima' serial 8412-11 / 93-145 is the trail or slave remote on the mid-train pair of units, note the large flat fuel tank indicating this unit was a Comeng NSW built ALCo before rebuild. GeoData.
|
|
![Filename=227-03.jpg
Filesize=223KiB
Dimensions=1280x851
Date added=Nov 13, 2015 227-03.jpg](albums/Pilbara/227/thumb_227-03.jpg)
227-0381 viewsNelson Point, view along A and B berths from Shiploader 2, Shiploader 1 on B berth, reclaimers 3 and 4 visible behind the under harbour tunnel feed conveyor. GeoData.
|
|
![Filename=227-07.jpg
Filesize=222KiB
Dimensions=1280x853
Date added=Nov 13, 2015 227-07.jpg](albums/Pilbara/227/thumb_227-07.jpg)
227-0781 viewsNelson Point, view along the rear of A and B berths from Shiploader 2, salt pile on the left, then the under harbour tunnel portal, old reclaimers 3 and 4 with the crushing building in the distance, which has now been demolished, and the rear of Shiploader 1 on B berth. GeoData.
|
|
![Filename=228-01.jpg
Filesize=297KiB
Dimensions=1280x850
Date added=Nov 13, 2015 228-01.jpg](albums/Pilbara/228/thumb_228-01.jpg)
228-0181 viewsNoranda, Perth, a Sigma sedan after running up the arse of my HJ75 Landcruiser. Only damage to the ute was a numberplate!
|
|
![Filename=228-02.jpg
Filesize=187KiB
Dimensions=1280x850
Date added=Nov 13, 2015 228-02.jpg](albums/Pilbara/228/thumb_228-02.jpg)
228-0281 viewsNoranda, Perth, a Sigma sedan after running up the arse of my HJ75 Landcruiser. Only damage to the ute was a numberplate!
|
|
![Filename=230-05.jpg
Filesize=303KiB
Dimensions=1280x850
Date added=Nov 13, 2015 230-05.jpg](albums/Pilbara/230/thumb_230-05.jpg)
230-0581 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
|
|
![Filename=230-37.jpg
Filesize=231KiB
Dimensions=1280x849
Date added=Nov 13, 2015 230-37.jpg](albums/Pilbara/230/thumb_230-37.jpg)
230-3781 viewsYandi Two balloon loop, 3/4 view from no. 2 end of Goninan rebuilt GE CM40-8M model 5639 'Corunna Downs' serial 8281-03/92-128 from AE Goodwin built ALCo C636 5459. Shows the silver BHP Australia logo, the logo on the hood has been painted out. Geodata -22.718338, 119.039909 .
|
|
![Filename=231-00.jpg
Filesize=260KiB
Dimensions=1280x846
Date added=Mar 21, 2016 231-00.jpg](albums/Pilbara/231/thumb_231-00.jpg)
231-0081 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|
![Filename=231-09.jpg
Filesize=277KiB
Dimensions=851x1280
Date added=Mar 21, 2016 231-09.jpg](albums/Pilbara/231/thumb_231-09.jpg)
231-0981 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|
![Filename=232-11.jpg
Filesize=212KiB
Dimensions=1280x842
Date added=Mar 21, 2016 232-11.jpg](albums/Pilbara/232/thumb_232-11.jpg)
232-1181 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-19.jpg
Filesize=312KiB
Dimensions=1280x853
Date added=Mar 21, 2016 232-19.jpg](albums/Pilbara/232/thumb_232-19.jpg)
232-1981 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore loaded Comeng WA built ore waggon 2871 has been re-sheeted with 3CR12 stainless steel side walls. February 1997. GeoData.
|
|
![Filename=232-25.jpg
Filesize=203KiB
Dimensions=1280x846
Date added=Mar 21, 2016 232-25.jpg](albums/Pilbara/232/thumb_232-25.jpg)
232-2581 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
|
|
![Filename=233-16.jpg
Filesize=252KiB
Dimensions=1280x845
Date added=Mar 21, 2016 233-16.jpg](albums/Pilbara/233/thumb_233-16.jpg)
233-1681 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|
![Filename=234-06.jpg
Filesize=263KiB
Dimensions=1280x856
Date added=Mar 21, 2016 234-06.jpg](albums/Pilbara/234/thumb_234-06.jpg)
234-0681 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of left hand side of cab. Circa 1998.
|
|
![Filename=234-14.jpg
Filesize=205KiB
Dimensions=1280x848
Date added=Mar 21, 2016 234-14.jpg](albums/Pilbara/234/thumb_234-14.jpg)
234-1481 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of right hand side engine hood and fuel tank. Circa 1998.
|
|
![Filename=236-32.jpg
Filesize=325KiB
Dimensions=1280x852
Date added=Apr 03, 2016 236-32.jpg](albums/Pilbara/236/thumb_236-32.jpg)
236-3281 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6071 'Chichester' serial 51063 sits out the front with new windscreen protectors or 'blinkers' fitted next to sister unit 6077.
|
|
![Filename=238-24.jpg
Filesize=322KiB
Dimensions=1280x852
Date added=Apr 03, 2016 238-24.jpg](albums/Pilbara/238/thumb_238-24.jpg)
238-2481 viewsNelson Point loco overhaul shop, former Union Pacific loco 3523 an EMD SD40-2 model, serial 786170-25 and now numbered 3085 for BHP Billiton Iron One service had only been in operation for eleven days when this shot was taken on the 27th November 2004. Geodata .
|
|
![Filename=040810_144845.jpg
Filesize=500KiB
Dimensions=1280x960
Date added=Jan 18, 2017 040810_144845.jpg](albums/Pilbara/BHP_Rolling_Stock_-_non_ore/thumb_040810_144845.jpg)
040810 14484581 viewsShaw Siding backtrack, built by Difco Ohio USA in 1971, long side dump waggon 701, one of four such waggons built for Mt Newman.
|
|
![Filename=040814_092011.jpg
Filesize=348KiB
Dimensions=1280x960
Date added=Jan 18, 2017 040814_092011.jpg](albums/Pilbara/BHP_Rolling_Stock_-_non_ore/thumb_040814_092011.jpg)
040814 09201181 viewsNelson Point, CFCLA ballast waggon CHQY type 730 just being delivered to BHP Iron Ore as part of the Rail PACE project, view of code board.
|
|
![Filename=040815_164812.jpg
Filesize=400KiB
Dimensions=1280x960
Date added=Jan 18, 2017 040815_164812.jpg](albums/Pilbara/BHP_Rolling_Stock_-_non_ore/thumb_040815_164812.jpg)
040815 16481281 viewsNelson Point, CFCLA ballast waggon CHQY type 730, view from handbrake end.
|
|
3681 files on 185 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
90 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|