Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
150523_8224.jpg
150523 8224421 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0033 with safety slogan 'Don't drive tired', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
231-09.jpg
231-09421 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
231-31.jpg
231-31421 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
236-14.jpg
236-14421 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 sits out the front with new windscreen protectors or 'blinkers' fitted.
238-09.jpg
238-09421 viewsPort Hedland Harbour, heavy lift ship Happy Buccaneer (IMO: 8300389) sits at Finucane Island D Berth delivering a new shiploader for BHP Billiton. 1st November 2003. Geodata . Back in time here the ship cranes were only 550 tonne each, these are now 700.
050518_2081.jpg
CHQY 745 050518 2081421 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 745.
051001_5684.jpg
6209 Comeng WA 051001 5684421 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #12, 6209, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
050315_0237.jpg
0012 Comeng NSW 050315 0237421 viewsRedbank Bridge, elevated view of empty 116 kL fuel tanks all built by Comeng in both NSW and WA, 0012 and 0016 and others in the BHP blue and white livery.
071202_1231.jpg
6004 Vickers Hoskins WA 071202 1231421 viewsTurner Siding, Jumbo Flat waggon 6004 loaded with a new bridge deck, 6004 is an Ortner Car Company Cincinnati Ohio design, built by Vickers Hoskins in Perth WA 1969.
050410_0510.jpg
050410 0510421 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
050414_0938.jpg
050414 0938421 viewsFlash Butt yard, Barclay Mowlem ballast regulator. 14th April 2005.
050625_3811.jpg
050625 3811421 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, some Barclay Mowlem track machines are off clear of the running lines, a sleeper crane is at the front with three sleeper inserters behind. 25th June 2005.
060501_3918.jpg
060501 3918421 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder, serial M20 bar coupled to RG 2. 1st May 2006.
150619_9102.jpg
0713 CNR - QRRS China 150619 9102421 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0713 loaded with fines for sheeting.
060724_7864.jpg
060724 7864421 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 24th July 2006.
243-10.jpg
243-10421 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
269-15.jpg
269-15421 viewsBing North and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
040912_152402r.jpg
1560 Comeng 040912 152402421 viewsNelson Point, condemned Comeng WA built BHP ore waggon 1560, used here as a ground anchor on Stacker 4. Waggon 1560 was built in an order of two hundred and eighty-eight waggons in 1974. September 12, 2004.
227-34.jpg
227-34420 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. Toyota tray back. GeoData.
228-08.jpg
228-08420 viewsYandi Two mobile machine fuel point. A Caterpillar 16G road motor grader is receiving attention.
6217 files on 311 page(s) 91

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional