Most viewed - Pilbara negative and digital Albums - Iron Ore |

050625 3814385 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, two Barclay Mowlem sleeper inserter track machines off clear of the running lines. 25th June 2005.
|
|

060501 3918385 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder, serial M20 bar coupled to RG 2. 1st May 2006.
|
|

080621 2731385 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, close up of bogie and detail of A end.
|
|

170729 0135385 viewsGreen Pool, an empty Rio Tinto iron ore train runs along the Lyndon River behind General Electric built ES44DCi unit 8184 serial 60782 and a pair of Pilbara Iron liveried with HI reporting marks General Electric built Dash 9-44CW units 7045 and 7049. 29th July 2017. GeoData.
|
|

5952 001385 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
|
|

241-11385 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs. June 2002.
|
|

080124 1627385 viewsChapman Siding, new FMG ore waggon pair 1311 slave and 2312 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

283-32385 viewsNear Woodbrook as quad Robe River CM40-8M units 9414, 9420, 9410 and 9525 work a loaded 202 waggons bound for Cape Lambert as they power through the cutting up a short grade at the 37.5 km pipe bridge. 9414 with serial number 8206-11 / 91-124 was rebuilt by Goninan in 1991 from AE Goodwin built M636 ALCo model with original serial number G-6060-5 from 1971. 22nd of May 2002.
|
|

110620 1965r385 viewsWalla Siding, comparison between two BHP ore waggons loaded with Yandi fines of the Golynx design type, 8410 was built in November 2001 for bottom discharge on the Goldsworthy system with serial number 950088-340, while 6834 was built in 2008. The burn or weld marks are still visible on 8410 from when it was in GML service, now converted for rotary service, noticed the filled in end and the angle section along the top edge for support. 20th of June 2011.
|
|

222-32384 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7071 serial 47750 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train away from the passing track back onto the mainline following a crew change with second unit 7066.
|
|

234-06384 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of left hand side of cab. Circa 1998.
|
|

040806 101910384 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, 3/4 view from handbrake end.
|
|

050410 0537384 viewsNelson Point, tanker filling area, fuel tank waggon 0018, a Comeng WA built 114 kilolitre tank waggon, one of a batch of three built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
|
|

050518 2164384 viewsBing Siding. Side view of 1963 built Magor USA waggon 535, originally in ore service before conversion to a ballast waggon.
|
|

050518 2169384 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 533, originally in ore service before conversion to a ballast waggon.
|
|

060414 3439384 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton.
|
|

060429 3725384 viewsFlash Butt yard, Pony waggon #1, modified from a Magor USA built Oroville ore waggon, with a Comeng built gantry carrier.
|
|

050409 0402384 viewsShell Swagman Roadhouse, side view of Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

050421 1612384 viewsHesta Siding backtrack, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this front unit was later stickered as RG 2, side view of the driving cab on the generator module. 21st April 2005.
|
|

050625 3820384 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, some Barclay Mowlem track machines are off clear of the running lines, a sleeper crane is at the front with three sleeper inserters behind. 25th June 2005.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
91 |  |
 |
 |
 |
 |
 |
 |
|