Most viewed - Pilbara negative and digital Albums - Iron Ore |

238-21419 viewsNelson Point loco overhaul shop, former Union Pacific loco 3523 an EMD SD40-2 model, serial 786170-25 and now numbered 3085 for BHP Billiton Iron One service had only been in operation for eleven days when this shot was taken on the 27th November 2004. Geodata .
|
|

239-04419 viewsOverview looking south west from the radial stacker towards the Yandi One mine pit. GeoData.
|
|

0510 Mt Newman Mining Workshops 040806 091220419 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a test waggon.
|
|

0523 Magor USA 050412 0768419 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA waggon 523, originally in ore service before conversion to a ballast waggon.
|
|

CHRY 748 050518 2099419 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 748.
|
|

CHRY 752 050518 2106419 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 752.
|
|

CHRY 756 050518 2125419 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 756, shows brake rigging plate for original owner, C&NW.
|
|

6011 Scotts of Ipswich Qld 050801 4766419 viewsFlash Butt yard, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich Qld on 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

0206 USA 051001 5626419 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of handbrake end, pushed into earth bund.
|
|

6205 Comeng WA 051001 5720419 viewsBoodarie, the Steel Train or rail recovery and transport train flat waggon #27, third lead off waggon, 6205, built by Comeng WA in February 1977 under order no. 07-M-282 RY.
|
|

0665 Mt Newman Mining Workshops 050522 2741419 viewsGoldsworthy Junction, rail recovery and transport train, flat waggon 665, a cut down Magor USA built former Oroville Dam 91 ton ore waggon, used as the crib waggon on the steel train.
|
|

050724 4228419 viewsNelson Point yard, flat waggon #6? in service on the Pony re-laying train as a transport waggon for a gantry car as pictured. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.
|
|

0013 Comeng WA 050724 4309419 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
|
|

060429 3720419 viewsFlash Butt yard, view of Harsco 'Pony' track resleeping and relaying machine. Originally owned by Barclay Mowlem.
|
|

Pony Harsco 060429 3766419 viewsFlash Butt yard, view of Harsco 'Pony' track resleeping and relaying machine. Originally owned by Barclay Mowlem.
|
|

050407 0382419 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|

050410 0516419 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050625 3606419 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
|
|

060501 3905419 viewsAbydos Siding backtrack, Speno rail grinders RG 2 coupled to RG 1. 1st May 2006.
|
|

060501 3930419 viewsAbydos Siding backtrack, Speno rail grinder RG 2 coupled to RG 1. 1st May 2006.
|
|
| 6217 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
94 |  |
 |
 |
 |
 |
 |
 |
|