Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
050518_2206.jpg
050518 220680 viewsBing Siding, a Gemco sleeper inserter track machine attached to a BHB type crane painted in BHP blue await another work day. 18th May 2005.
050625_3600.jpg
050625 360080 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480 with support road vehicle TM 10. 25th June 2005.
050625_3633.jpg
050625 363380 viewsMooka North backtrack holds BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480 as a ballast train runs past on the passing track as an empty ore train is on the mainline. 25th June 2005.
050801_4743.jpg
050801 474380 viewsFlash Butt yard, BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 1st August 2005.
080621_2733.jpg
080621 273380 viewsGillman Siding, view from rear of rail recovery and transport train with new Lead-Off Lead-On waggon STTR class STTR 6214 on the end built by Gemco Rail WA.
100717_0671.jpg
100717 067180 viewsFlash Butt yard, new rail stock carrier waggon 6025, built by Gemco Rail in late 2009-10 with Barber bogies.
150523_8216.jpg
150523 821680 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0032, one of a second batch delivered in 2015 with safety slogan 'Start with safety'.
171121_0960.jpg
171121 096080 viewsBarker Siding, FMG's ballast loading single ended siding, stabled are the Loram MPC 2 grinder and the FMG ballast waggon set. 21st November 2017.
242-29.jpg
242-2980 viewsPort Hedland, Don Rhodes Mining Museum, preserved Goldsworthy Mining B class unit #2 serial number A-105, these units of Bo-Bo design with a 6CSRKT 640 kW prime mover were built at the English Electric Rocklea Qld plant in 1965 and primarily used for the construction of the Mt Goldsworthy to Finucane Island railway. May 2002.
080116_1380.jpg
080116 138080 viewsChapman Siding 69 km, the Zhuzhou Rolling Stock Works cast bogie underneath FMG master waggon 2372, bogie has a cast date of 08-07 for August 2007 and is riding on Timken AP Glass G 7 x 17 bearings. 16th January 2008.
247-02.jpg
247-0280 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard waiting to drag a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
220-25.jpg
220-2579 viewsGoldsworthy Junction, a loaded train from Yarrie mine lead by BHP Dash 7 unit 5507 'Nimingarra' serial 4839-03 / 87-072 a Goninan WA ALCo rebuild C36-7M model and one each of the second-hand waggons purchased from Phelps Dodge Copper Mine, the ribbed unit 352 is a Portec USA build while the smooth sided 300 waggon is a Gunderson USA build.
222-26.jpg
222-2679 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie with 7091 has stopped for a crew change besides a loaded headed up by 7071.
224-28.jpg
224-2879 viewsBing siding, mid-train remote units Goninan rebuild CM40-8M GE units 5638 'Mallina' serial 8281-02 / 92-127 leads sister unit 5669. GeoData.
225-05.jpg
225-0579 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach behind General Electric AC6000 6074 serial 51066 built by GE at Erie as it passes Goninan rebuild CM40-8M GE unit 5669. GeoData.
225-07.jpg
225-0779 viewsBing siding, the afternoon departure for Yandi mine heads south past the ballast consist, behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
226-02.jpg
226-0279 viewsYule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.
226-22.jpg
226-2279 viewsShaw siding back track at the 219 km, Speno RR 24 M-1 rail grinder stabled in back track, side view. GeoData.
226-25.jpg
226-2579 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
227-37.jpg
227-3779 viewsNelson Point, tug boat Warilla, 50 ton bollard pull Z-Peller type, built by Tamar Steel Boats in Launceston in 1982, pulls a loaded carrier clear of B berth as a sister vessel Warang passes behind.
3681 files on 185 page(s) 96

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional