Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
230-15.jpg
230-15418 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
230-16.jpg
230-16418 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The ore stockpile and pedestal stacker are visible. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
150523_8214.jpg
150523 8214418 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0034, view of B End, built in China by CNR - QRRS.
231-11.jpg
231-11418 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
231-33.jpg
231-33418 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
233-12.jpg
233-12418 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
238-14.jpg
238-14418 viewsNelson Point, ex Southern Pacific tunnel motor locomotive 8335 an EMD SD40T-2 unit, serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, purchased as a spare parts source for the other SD40 style units BHP Billiton purchased in 2003/04. 19th November 2003. Geodata .
040806_091122.jpg
040806 091122418 viewsGoldsworthy Junction, trailing view of the weighbridge test train with the four orange weighbridge test waggons and one of the two Comeng built ore waggons to provide braking, 5666 is the power.
040806_091220.jpg
0510 Mt Newman Mining Workshops 040806 091220418 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a test waggon.
040806_101952.jpg
0206 Mt Newman Mining Workshops 040806 101952418 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of number board and 50 t load stencil.
040815_171350.jpg
0020 Comeng NSW 040815 171350418 viewsNelson Point, detail view of data placard of fuel tank waggon 0020, 82 kilolitre capacity built by Comeng NSW for BP as RTC 2, used by Mt Newman Mining, unsure when converted to 0020.
050412_0771.jpg
0523 Magor USA 050412 0771418 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 523, originally in ore service before conversion to a ballast waggon.
050525_2952.jpg
6012 Scotts of Ipswich Qld 050525 2952418 viewsMooka Siding, rail recovery and transport train flat waggon #18, 6012, built by Scotts of Ipswich Qld in September 1970, view of number board and rail support structure.
060429_3720.jpg
060429 3720418 viewsFlash Butt yard, view of Harsco 'Pony' track resleeping and relaying machine. Originally owned by Barclay Mowlem.
060501_3900.jpg
8702 Difco USA 060501 3900418 viewsTabba Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8702 side dump waggon loaded with ballast.
050411_0599.jpg
050411 0599418 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 comes off the former Goldsworthy line at signal GJ 9 with the Newman mainline in the foreground. 11th April 2005.
050421_1314.jpg
050421 1314418 viewsShaw Siding, BHP's Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper runs along the mainline track. 21st April 2005.
050801_4729.jpg
050801 4729418 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator. 1st August 2005.
060710_6232.jpg
060710 6232418 viewsAt the Broome Rd grade crossing Port Hedland, track machine BR 33 a Plasser Australia ballast regulator model SSP 302 serial M486. 10th July 2006.
060811_7966.jpg
060811 7966418 viewsNorth of Gillam is track machine BR 33 a Plasser Australia ballast regulator model SSP 302 serial M486. 11th August 2006.
6217 files on 311 page(s) 96

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional