Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
226-06.jpg
226-06106 viewsRedmont, at the 202 km, a loaded Yandi train descends the .76 percent grade with the standard of the time Double Dash 8 combination with Goninan rebuild CM40-8M GE unit 5653 'Chiba' serial 8412-10/93-144 leading sister unit 5643 down the grade. GeoData.
226-19.jpg
226-19106 viewsShaw North, 216.5 km, departure repeater signal post SWN 4R for the mainline is aimed across the 700 metre radius curve that north bound trains face. GeoData.
226-31.jpg
226-31106 viewsShaw siding, the loaded train heading north around the 698 metre radius curve behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons. GeoData.
226-32.jpg
226-32106 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.
226-33.jpg
226-33106 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.
227-11.jpg
227-11106 viewsPort Hedland harbour control tower, the salt conveyor is at the bottom of the picture, the high building beyond the tower is the Esplanade Hotel, with the two story building to the right of the tower the Port Authority offices. GeoData.
227-14.jpg
227-14106 viewsNelson Point, view of the under harbour portal arrangement, reclaimer 3 and other bits of now removed infrastructure can be seen. GeoData.
227-20.jpg
227-20106 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
227-37.jpg
227-37106 viewsNelson Point, tug boat Warilla, 50 ton bollard pull Z-Peller type, built by Tamar Steel Boats in Launceston in 1982, pulls a loaded carrier clear of B berth as a sister vessel Warang passes behind.
229-05.jpg
229-05106 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout with mid-train remote units Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151 leading sister unit 5657, grade crossing is the YT 311.5 km. GeoData.
229-13.jpg
229-13106 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151. GeoData.
230-03.jpg
230-03106 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
231-07.jpg
231-07106 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
231-14.jpg
231-14106 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650, note the missing logo from the hood and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
231-15.jpg
231-15106 viewsYandi Two balloon loop, BHP Iron Ore 5650 'Yawata' serial 8412-09 / 93-141 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as second unit, note the logos are the original teal and marigold and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
232-22.jpg
232-22106 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
232-27.jpg
232-27106 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
233-15.jpg
233-15106 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
233-35.jpg
233-35106 viewsYandi Two balloon loop, new United Goninan WA built iron ore waggon 4157, delivered in March 1997 as part of a batch of 126 waggons made from 3CR12 steel with tapered floors. GeoData.
234-03.jpg
234-03106 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of front pilot. Circa 1998.
3983 files on 200 page(s) 97

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional