234-10.jpg
234-10106 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of left hand side radiator section. Circa 1998.
234-12.jpg
234-12106 viewsYandi Two, loaded BHP Iron Ore waggon #4316 a Goninan built 3CR12 style stainless steel construction from 1997. Handbrake and bogie view.
236-32.jpg
236-32106 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6071 'Chichester' serial 51063 sits out the front with new windscreen protectors or 'blinkers' fitted next to sister unit 6077.
239-33.jpg
239-33106 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.
239-35.jpg
239-35106 viewsYandi Two, cab side shot of Goninan Dash 8 unit CM40-8M 5644 'Kangan' serial 8281-09/92-133, rebuilt from AE Goodwin built ALCo M636 5471 serial G6047-3 still with ALCo Hi-Ad bogies.
040806_092046.jpg
040806 092046106 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
040806_101910.jpg
040806 101910106 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, 3/4 view from handbrake end.
040810_144930.jpg
040810 144930106 viewsShaw Siding backtrack, built by Difco Ohio USA in 1971, long side dump waggon 701, one of four such waggons built for Mt Newman.
040810_145007.jpg
040810 145007106 viewsShaw Siding backtrack, Difco Ohio USA 1967 build short side dump waggon 5, originally built for Goldsworthy Mining, but not yet renumbered by BHP Iron Ore, it should be 8705, one five waggons built for Goldsworthy Mining.
040815_164800.jpg
040815 164800106 viewsNelson Point, CFCLA ballast waggon CHQY type 730 having just been offloaded from road transport and placed on rail, view from handbrake end.
050319_0140.jpg
050319 0140106 viewsNelson Point, cut down Magor USA built former Oroville Dam 91 ton ore waggon 665, now used as the crib waggon on the steel train, 3/4 view.
050319_0144.jpg
050319 0144106 viewsNelson Point, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
050518_2117.jpg
050518 2117106 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746, rear view of hydraulics and pneumatics.
050518_2119.jpg
050518 2119106 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of number board and 50 t load stencil.
050518_2137.jpg
050518 2137106 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 753, STB decal.
050518_2159.jpg
050518 2159106 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 529, originally in ore service before conversion to a ballast waggon.
051001_5700.jpg
051001 5700106 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #18, 6012, detail of builders plate, a Scotts of Ipswich Qld built flat waggon with build date 11-09-1970.
051001_5731.jpg
051001 5731106 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #30, 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
051001_5739.jpg
051001 5739106 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #30, 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
050315_0237.jpg
050315 0237106 viewsRedbank Bridge, elevated view of empty 116 kL fuel tanks all built by Comeng in both NSW and WA, 0012 and 0016 and others in the BHP blue and white livery.
3983 files on 200 page(s) 98

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional