Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums

Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums
130705_0535.jpg
130705 0535313 viewsLock, cab view through windows of former Australian National narrow gauge 830 class locomotive 846, an AE Goodwin built ALCo DL531 model with serial 84715 built new for the SAR in 1963 and delivered to Adelaide Division on broad gauge, transferred to Tasmania on narrow gauge in 1982, then back to SA on standard gauge in 1989 and then Whyalla in 2008 on narrow gauge. In 2012 is was delivered to Port Lincoln, the last loco delivered to the Eyre Peninsula. 5th July 2013.
130705_0576.jpg
130705 0576313 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left is the Ascom silo complex (Block 5), the train is loading on the grain loop, horizontal bunker (Block 4) on the right. 5th of July 2013.
245-15.jpg
245-15313 viewsWudinna, empty grain train shunts over Gooch Terrace as it takes a rake of waggons into the grain siding, former Australian National locomotive AE Goodwin ALCo model DL531 830 class units 851 serial 84137 has been on the Eyre Peninsula since delivered in 1962. 7th April 2003.
130703_0153.jpg
130703 0153312 viewsMurdinga, view looking north at the eight cell concrete silo complex built by SACBH with the Ascom silo visible behind and train being loaded in the siding. Geo location. 3rd July 2013.
130703_0165.jpg
130703 0165312 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
130703_0248.jpg
130703 0248312 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
130703_0266.jpg
130703 0266312 viewsKaldow, HAN type bogie grain hopper waggon HAN 59, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system. 3rd July 2013.
130704_0453.jpg
130704 0453312 viewsKyancutta, HAN type bogie grain hopper waggon HAN 46, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0488.jpg
130704 0488312 viewsMoule, yard overview looking east, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the end of the ballast siding with the crossing loop rejoining the mainline just before the grade crossing to access the ballast stockpile area. Location is here. 4th July 2013.
130704_0500.jpg
130704 0500312 viewsMoule, looking east at the east end points for the crossing loop, grade crossing is for access to ballast stockpile area, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. Location is here. 4th July 2013.
130704_0503.jpg
130704 0503312 viewsMoule, yard overview looking west from the east end points of the crossing loop, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left point lever and indicator, the crossing loop on the right and then the ballast pile in the distance. Location is here. 4th July 2013.
130705_0578.jpg
130705 0578312 viewsLock, grain train shunting with 1203, 846 and 859 pushing back down the mainline with a loaded cut of grain waggons. 5th of July 2013.
130705_0606.jpg
130705 0606312 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.
130708_0792.jpg
130708 0792312 viewsCharra, crossing loop, 466.2 km.
130703_0151.jpg
130703 0151311 viewsMurdinga, view looking north at the eight cell concrete silo complex built by SACBH with the Ascom silo visible behind and train being loaded in the siding. Geo location. 3rd July 2013.
130703_0191.jpg
130703 0191311 viewsTooligie, view of Ascom Jumbo silo complex with the elevator structure and covers over the dual truck unloading grates. 3rd July 2013.
130703_0255.jpg
130703 0255311 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
130704_0391.jpg
130704 0391311 viewsKyancutta, HAN type bogie grain hopper waggon HAN 7, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0424.jpg
130704 0424311 viewsKyancutta, waggon consignment card fixed to HCN type bogie grain hopper waggon HCN 13 on the A end with the Westinghouse grade control valve selected to L for loaded, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984.
130704_0485.jpg
130704 0485311 viewsKyancutta, the rear of a south bound loaded grain as it departs with the final four waggons all HCN type bogie grain hoppers converted by SAR Islington Workshops from Tulloch Ltd NSW built NHB type hopper waggons. 4th July 2013.
2177 files on 109 page(s) 101

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional