Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums

Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums
130708_0912.jpg
130708 091287 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 37, with hungry boards still fitted, loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
130708_0938.jpg
130708 093887 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 25, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
130708_0941.jpg
130708 094187 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 32, with hungry boards still fitted coupled to others with them removed, loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
130703_0158.jpg
130703 015886 viewsMurdinga, overview of the station yard looking north, Mallee style shelter train control building on the left, grain train loading on the siding, eight cell concrete grain silo complex with Ascom single cell behind it. Geo location. 3rd July 2013.
130703_0165.jpg
130703 016586 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
130703_0173.jpg
130703 017386 viewsTooligie, HBN 1 leader of the HBN type dual use ballast / grain hopper waggons, one of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000.
130703_0180.jpg
130703 018086 viewsTooligie, HAN type bogie grain hopper waggon HAN 35, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130703_0184.jpg
130703 018486 viewsTooligie, over view of the grain complex, Ascom Jumbo silo complex with over rail loading hopper and a four cell concrete silo complex beside it. Geo location. 3rd July 2013.
130703_0190.jpg
130703 019086 viewsTooligie, view of Ascom Jumbo silo complex with over rail loading bin with covers over the dual truck unloading grates. 3rd July 2013.
130703_0248.jpg
130703 024886 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
130703_0280.jpg
130703 028086 viewsKaldow, HCN type bogie grain hopper waggon HCN 29, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
130703_0297.jpg
130703 029786 viewsKaldow, HAN type bogie grain hopper waggon HAN 67, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0456.jpg
130704 045686 viewsKyancutta, HAN type bogie grain hopper waggon HAN 17, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0489.jpg
130704 048986 viewsMoule, yard overview looking west, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the Mallee style shelter shed, mainline, crossing loop and ballast siding. Location is here. 4th July 2013.
130704_0504.jpg
130704 050486 viewsMoule, Trak-Lok M7.5 steel sleeper for 31 kg/m rail manufactured by BHP in 1996, the 7.5 is the thickness in millimetres of the steel used. 4th July 2013.
130705_0553.jpg
130705 055386 viewsLock, HBN type dual use ballast / grain hopper waggons, HBN 5. One of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000. 5th July 2013.
130705_0583.jpg
130705 058386 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.
130705_0596.jpg
130705 059686 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.
130705_0598.jpg
130705 059886 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
130705_0613.jpg
130705 061386 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
2177 files on 109 page(s) 101

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional