Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums |

060110 2227364 viewsKarkoo, empty grain train behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge and to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|

060113 2528363 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.
|
|

130703 0261363 viewsKaldow, third unit on a Port Lincoln bound grain train Genesee & Wyoming locomotive AE Goodwin ALCo model DL531 unit 859 'City of Port Lincoln' serial 84705, built in 1963, 859 started life at Peterborough, spent some years in Tasmania and even spent time in Perth on standard gauge before being transferred to the Eyre Peninsula system in 2003. 3rd July 2013.
|
|

130703 0268363 viewsKaldow, HAN type bogie grain hopper waggon HAN 12, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130703 0271363 viewsKaldow, HCN type bogie grain hopper waggon HCN 22, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|

130703 0276363 viewsKaldow, HAN type bogie grain hopper waggon HAN 27, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130705 0589363 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
|
|

130705 0609363 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
|
|

130708 0748363 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 60 N, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
|
|

130708 0755363 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 42 P, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
|
|

245-32363 viewsMinnipa looking in the down direction along the mainline across Burgoyne Terrace towards Poochera with goods siding #2 points and switch stand. 7th April, 2003.
|
|

060113 2559362 viewsThevenard, loaded gypsum train 6DD4 snakes into the yard behind 1600 class unit 1604 in Australian Railroad Group livery a Clyde Engineering built EMD JL22C model serial 71-731, originally built as NJ class NJ 4. Bergmann Dr grade crossing. 13th January 2006.
|
|

130703 0267362 viewsKaldow, type leader of the HBN type dual use ballast / grain hopper waggons, HBN 1, one of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000.
|
|

130703 0273362 viewsKaldow, HCN type bogie grain hopper waggon HCN 12, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover. Geo location. 3rd July 2013.
|
|

130704 0407362 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, the second driver has just restored the points for the mainline as the train waits across the Eyre Highway grade crossing and one of only three electric signals on the network, behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
|
|

130705 0537362 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
|
|

130705 0539362 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
|
|

130705 0590362 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
|
|

130705 0663362 viewsLock, HBN type dual use ballast / grain hopper waggons, HBN 11 still with side gangways in place. One of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000. 5th July 2013.
|
|

130708 0870362 viewsThevenard, view of arriving loaded train from inside the yard.
|
|
| 2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
101 |  |
 |
 |
 |
 |
 |
 |
|