Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums

Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums
130703_0255.jpg
130703 0255375 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
130704_0409.jpg
130704 0409375 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, seen here backing up to re-join the rest of the train on the mainline as it crosses the Eyre Highway grade crossing, behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
130705_0542.jpg
130705 0542375 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0609.jpg
130705 0609375 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
130708_0748.jpg
130708 0748375 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 60 N, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
130708_0757.jpg
130708 0757375 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 58 X, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
130708_0790.jpg
130708 0790375 viewsCharra, crossing loop, 466.2 km.
130703_0192.jpg
130703 0192374 viewsTooligie, a rake of loaded grain waggons of the HAN, HBN and HCN types awaits collection for the trip to Port Lincoln. 3rd July 2013.
130703_0282.jpg
130703 0282374 viewsKaldow, HAN type bogie grain hopper waggon HAN 25, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0466.jpg
130704 0466374 viewsKyancutta, HBN type dual use ballast / grain hopper waggons, HBN 2, still with the side walkway fitted is one of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000.
130704_0496.jpg
130704 0496374 viewsMoule, yard view looking east from the western end of the loop towards the 446 km, crossing loop on the left, heavy track wear is evident. Location here, 4th July 2013.
130708_0804.jpg
130708 0804374 viewsCharra, crossing loop, 466.2 km.
060113_2474.jpg
060113 2474373 viewsThevenard, narrow gauge loco 1604 departs the yard with empty train 6DD3, 1604 leads a triple consist of Clyde Engineering built EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 the original class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 1604 and 1601 both renumbered in 2004. 13th January 2006.
130704_0433.jpg
130704 0433373 viewsKyancutta, 1200 class unit 1204 wearing current owner Genesee & Wyoming livery is a Clyde Engineering built EMD G12C model with serial 65-428 heads up a loaded grain train as it undertakes a brake test following shunting to attach a further fourteen waggons. 4th July 2013.
130704_0461.jpg
130704 0461373 viewsKyancutta, HAN type bogie grain hopper waggon HAN 23, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0486.jpg
130704 0486373 viewsMoule, Mallee style shelter shed as a station 'building' of sorts. Moule was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.
130705_0539.jpg
130705 0539373 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0662.jpg
130705 0662373 viewsLock, 1203, 846 and 859 depart along the mainline for Port Lincoln with the loaded grain train.
130708_0792.jpg
130708 0792373 viewsCharra, crossing loop, 466.2 km.
060113_2548.jpg
060113 2548372 viewsKevin, narrow gauge locos 1604, NJ 3 and 1601 take the mainline to Thevenard, having reversed train 6DD3 on the Kevin triangle as they prepare to load, 1600 class unit 1604 in Australian Railroad Group livery a Clyde Engineering built EMD JL22C model serial 71-731, originally built as NJ class NJ 4 and built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981. 13th January 2006.
2177 files on 109 page(s) 101

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional