Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums

Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums
130703_0192.jpg
130703 0192237 viewsTooligie, a rake of loaded grain waggons of the HAN, HBN and HCN types awaits collection for the trip to Port Lincoln. 3rd July 2013.
130703_0250.jpg
130703 0250237 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
130703_0279.jpg
130703 0279237 viewsKaldow, HAN type bogie grain hopper waggon HAN 38, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0394.jpg
130704 0394237 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, seen here running out of the 'new grain siding' added in 1970 behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
130704_0475.jpg
130704 0475237 viewsKyancutta, HCN type bogie grain hopper waggon HCN 7, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
130705_0616.jpg
130705 0616237 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0621.jpg
130705 0621237 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130703_0153.jpg
130703 0153236 viewsMurdinga, view looking north at the eight cell concrete silo complex built by SACBH with the Ascom silo visible behind and train being loaded in the siding. Geo location. 3rd July 2013.
130703_0164.jpg
130703 0164236 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
130703_0185.jpg
130703 0185236 viewsTooligie, over view of the grain complex, Ascom Jumbo silo complex with over rail loading hopper and a four cell concrete silo complex beside it. Geo location. 3rd July 2013.
130703_0249.jpg
130703 0249236 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
130704_0494.jpg
130704 0494236 viewsMoule, looking west towards Charra and Kevin along the roller coaster grades with the crossing loop on the right and the points for the ballast siding just behind the camera. Location here, 4th July 2013.
130705_0549.jpg
130705 0549236 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0589.jpg
130705 0589236 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
130703_0169.jpg
130703 0169235 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
130705_0546.jpg
130705 0546235 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0557.jpg
130705 0557235 viewsLock, HAN type bogie grain hopper waggon HAN 18, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system. 5th July 2013.
130705_0609.jpg
130705 0609235 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
130705_0628.jpg
130705 0628235 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130703_0152.jpg
130703 0152234 viewsMurdinga, view looking north at the eight cell concrete silo complex built by SACBH with the Ascom silo visible behind and train being loaded in the siding. Geo location. 3rd July 2013.
2177 files on 109 page(s) 106

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional