Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums |

130705 0634306 viewsLock, HAN type bogie grain hopper waggon HAN 50, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130705 0659306 viewsLock, 1203, 846 and 859 depart along the mainline for Port Lincoln with the loaded grain train.
|
|

130703 0154305 viewsMurdinga, rear view of the three locomotives, 859 'City of Port Lincoln', 906 and 1203 on the lead. Geo location. 3rd July 2013.
|
|

130703 0215305 viewsNowhere Else,
|
|

130703 0251305 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
|
|

130705 0639305 viewsLock, HAN type bogie grain hopper waggon HAN 35, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130705 0647305 viewsLock, 859, 846 and 1203 shunt back into the yard, HAN type bogie grain hopper waggon HAN 59, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130708 0920305 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 22, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|

245-31305 viewsMinnipa yard looking in the up direction from the down end, on the left is goods siding #1, mainline to Port Lincoln, goods siding #2 and goods siding #3 on the right. 7th April, 2003.
|
|

130705 0614304 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130703 0198303 viewsTooligie, HAN type bogie grain hopper waggon HAN 59, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130703 0250303 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
|
|

130705 0602303 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
|
|

130705 0601303 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.
|
|

130705 0636303 viewsLock, HCN type bogie grain hopper waggon HCN 4, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|

130703 0173302 viewsTooligie, HBN 1 leader of the HBN type dual use ballast / grain hopper waggons, one of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000.
|
|

130703 0179302 viewsTooligie, HAN type bogie grain hopper waggon HAN 13, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130703 0210302 viewsNowhere Else,
|
|

130703 0247302 viewsKaldow, side view of track formation, looks to have been done up recently, steel sleepers and fresh ballast. Geo location. 3rd July 2013.
|
|

130705 0545302 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
|
|
| 2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
106 |  |
 |
|