Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums |

130704 0419266 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, seen here backing up to re-join the rest of the train on the mainline with one of only three electric signals on the network, behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
|
|

130705 0549266 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
|
|

130705 0562266 viewsLock, HCN type bogie grain hopper waggon HCN 24, originally an NHB type hopper NHB 1575 built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Fitted with a Moose Metalworks roll-top cover. 5th July 2013.
|
|

130705 0618266 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0621266 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0636266 viewsLock, HCN type bogie grain hopper waggon HCN 4, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|

130703 0173265 viewsTooligie, HBN 1 leader of the HBN type dual use ballast / grain hopper waggons, one of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000.
|
|

130705 0590265 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
|
|

245-30265 viewsMinnipa yard, looking in the up direction at the switch stand from goods siding 2 to goods siding 3 located at the down (north) end of the yard. 7th April, 2003.
|
|

245-33265 viewsMinnipa yard, looking in the up direction at the switch stand from goods siding 2 to goods siding 3 located at the down (north) end of the yard. 7th April, 2003.
|
|

130703 0210264 viewsNowhere Else,
|
|

130704 0394264 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, seen here running out of the 'new grain siding' added in 1970 behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
|
|

130704 0485264 viewsKyancutta, the rear of a south bound loaded grain as it departs with the final four waggons all HCN type bogie grain hoppers converted by SAR Islington Workshops from Tulloch Ltd NSW built NHB type hopper waggons. 4th July 2013.
|
|

130705 0589264 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
|
|

130705 0602264 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
|
|

130705 0601264 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.
|
|

130705 0615264 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0616264 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130703 0169263 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
|
|

130703 0185263 viewsTooligie, over view of the grain complex, Ascom Jumbo silo complex with over rail loading hopper and a four cell concrete silo complex beside it. Geo location. 3rd July 2013.
|
|
2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
106 |  |
 |
|