Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums |

130703 0184316 viewsTooligie, over view of the grain complex, Ascom Jumbo silo complex with over rail loading hopper and a four cell concrete silo complex beside it. Geo location. 3rd July 2013.
|
|

130703 0198316 viewsTooligie, HAN type bogie grain hopper waggon HAN 59, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130703 0215316 viewsNowhere Else,
|
|

130703 0254316 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
|
|

130705 0602316 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
|
|

130705 0614316 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

245-28316 viewsYaninee, trailing view of an empty grain train as it trundles over Hunt Terrace with its motely collection of grain waggons as it runs 'express' through Yaninee. 7th April, 2003.
|
|

245-29316 viewsYaninee, trailing view of an empty grain train as it trundles over Hunt Terrace with its motely collection of grain waggons as it runs 'express' through Yaninee. 7th April, 2003.
|
|

130703 0154315 viewsMurdinga, rear view of the three locomotives, 859 'City of Port Lincoln', 906 and 1203 on the lead. Geo location. 3rd July 2013.
|
|

130703 0169315 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
|
|

130705 0545315 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
|
|

130705 0597315 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
|
|

130705 0629315 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130703 0145314 viewsMurdinga, HCN type bogie grain hopper waggon HCN 4, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|

130703 0168314 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
|
|

130703 0186314 viewsTooligie, over view of the yard, Ascom Jumbo silo complex over rail loading hopper with four cell concrete silo complex beyond it. Geo location. 3rd July 2013.
|
|

130703 0210314 viewsNowhere Else,
|
|

130705 0592314 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1.
|
|

130705 0596314 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.
|
|

130705 0595314 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.
|
|
| 2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
107 |  |
|