Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums

Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums
130704_0430.jpg
130704 043067 viewsKyancutta, 1200 class unit 1204 wearing current owner Genesee & Wyoming livery is a Clyde Engineering built EMD G12C model with serial 65-428 heads up a loaded grain train as it undertakes a brake test following shunting to attach a further fourteen waggons. 4th July 2013.
130705_0549.jpg
130705 054967 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0563.jpg
130705 056367 viewsLock, HBN type dual use ballast / grain hopper waggons, HBN 4 still with side gangways in place. One of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000. 5th July 2013.
130708_0768.jpg
130708 076867 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 1 U, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
130703_0170.jpg
130703 017066 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
130703_0183.jpg
130703 018366 viewsTooligie, over view of the grain complex, Ascom Jumbo silo complex with over rail loading hopper and a four cell concrete silo complex beside it. Geo location. 3rd July 2013.
130703_0253.jpg
130703 025366 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
130703_0275.jpg
130703 027566 viewsKaldow, HCN type bogie grain hopper waggon HCN 4, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
130703_0299.jpg
130703 029966 viewsKaldow, HAN type bogie grain hopper waggon HAN 2, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0408.jpg
130704 040866 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, the second driver has just restored the points for the mainline as the train waits across the Eyre Highway grade crossing and one of only three electric signals on the network, behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
130705_0572.jpg
130705 057266 viewsLock, HCN type bogie grain hopper waggon HCN 19, originally an NHB type hopper NHB 1026 built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Fitted with a Moose Metalworks roll-top cover. 5th July 2013.
130705_0585.jpg
130705 058566 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.
245-34.jpg
245-3466 viewsMinnipa yard looking in the up direction from the down end, on the left is goods siding #1, mainline to Port Lincoln, goods siding #2 and goods siding #3 on the right. 7th April, 2003.
130703_0191.jpg
130703 019165 viewsTooligie, view of Ascom Jumbo silo complex with the elevator structure and covers over the dual truck unloading grates. 3rd July 2013.
130705_0557.jpg
130705 055765 viewsLock, HAN type bogie grain hopper waggon HAN 18, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system. 5th July 2013.
130705_0661.jpg
130705 066165 viewsLock, 1203, 846 and 859 depart along the mainline for Port Lincoln with the loaded grain train.
130708_0740.jpg
130708 074065 viewsCharra, Charoban Rd grade crossing, 477.8 km.
130703_0168.jpg
130703 016864 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
130703_0256.jpg
130703 025664 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
130705_0630.jpg
130705 063064 viewsLock, the final loaded portion shunts up the mainline before rejoining the first portion sitting on the mainline in the yard, HAN type bogie grain hopper waggon HAN 38, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
2177 files on 109 page(s) 108

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional