Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums |

030411 105103461 viewsKimba Grain Bunker site, overhead mainline loading bin, looking south towards Kimba, augers from the storage area on the left.
|
|

060109 2095457 viewsKyancutta at the 198 km, ASR 830 class unit 842, an AE Goodwin built ALCo DL531 model loco serial 84140 leads EMD unit 1204 due to air-conditioning trouble and sister ALCo 851 across a dry salt soak with a north bound empty grain train. 9th January 2006.
|
|

215-08451 viewsPeterborough, 600 class locomotive 605 AE Goodwin ALCo model DL541 serial G6015-4 in the shafts of an SP goods train, this unit was rebuilt in 1994 as .
|
|

216-13450 viewsDry Creek Motive Power Centre, Australian National standard gauge light engines wearing the AN livery 700 class 705 AE Goodwin ALCo model DL500G serial G6059-3 and BL class leader BL 26 'Bob Hawke' Clyde Engineering EMD model JT26C-2SS serial 83-1010.
|
|

215-10440 viewsPeterborough, double Bulldog GM class units GM 43 Clyde Engineering EMD model A16C serial 67-529 and GM 46 serial 67-532 in the consist of power for an SP service awaiting line clear.
|
|

215-05439 viewsPort Augusta, AN liveried 830 class locomotive 859 AE Goodwin ALCo model DL531 serial 84705 performs shunting duties in the yard.
|
|

216-02438 viewsLong Plains, the down passenger train to Alice Springs 'The Ghan' on approach with power from an AN livered DL class DL 37 Clyde Engineering EMD model AT42C serial 88-1245.
|
|

217-02437 viewsKeswick Passenger Terminal, Australian National DL class locomotive DL 37 Clyde Engineering EMD model AT42C serial 88-1245 on the pointy end of 'The Ghan' as departure time approaches.
|
|

030415 071138436 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.
|
|

060113 2429434 viewsThevenard, GCF type weighbridge test waggon GCF 7083, originally built by SAR Islington Workshops as an CFN type cattle waggon CFN 7083 in 1945 and sent new to EP Division, converted in 1969 to GCF sleeper transport waggon, then to a Shunters Runner c.1975 and to the current guise c.1996. More details can be found for this waggon here. Seen here next to one of the silo complexes.
|
|

030411 101736433 viewsKimba Grain Bunker, train loading is almost complete with triple ALCo combination of 830 classes 871 and 872 and DA 7, model DL 531G/1, converted from 4813. 11th April 2003. Geodata here.
|
|

060111 2257432 viewsTooligie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 and its grain train. 11th January 2006.
|
|

215-06431 viewsPort Augusta, AN liveried 830 class locomotive 859 AE Goodwin ALCo model DL531 serial 84705 performs shunting duties in the yard.
|
|

030409 080811431 viewsWarramboo, empty grain prepares to get underway following a crew change. Rebuild unit DA 7 in Australian Southern orange and black livery leads a pair of AE Goodwin built ALCo model DL531 830 class units 872 and 871, the relieved crew in the car with the long disused station building on the left and the SACBH concrete silo complex on the right rounding out the scene.
|
|

215-17430 viewsDry Creek Yard, a pair of broad gauge V/Line C class locomotives rest between jobs.
|
|

060113 2428430 viewsCeduna, originally one of forty six Kinki Sharyo built NHA type waggons NHA 978 for the NAR in 1968, now coded ENHA type ENHA 2 with hungry boards loaded with gypsum on loaded train 6DD2 near the 436 km post.
|
|

215-09423 viewsPeterborough, double Bulldog GM class units GM 43 Clyde Engineering EMD model A16C serial 67-529 and GM 46 serial 67-532 in the consist of power for an SP service awaiting line clear.
|
|

216-15422 viewsDry Creek Motive Power Centre, fuel point roads sees V/Line broad gauge N class locomotive N 473 Clyde Engineering EMD model JT22HC-2 serial 87-1202, resting after running the overnight passenger train 'The Overland' from Melbourne, and will return with the Melbourne bound service in the early evening.
|
|

215-03420 viewsLong Plains, the down passenger train to Alice Springs 'The Ghan' on approach with power from an AN livered DL class DL 37 Clyde Engineering EMD model AT42C serial 88-1245.
|
|

030415 065601419 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units NJ 5 serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.
|
|
2177 files on 109 page(s) |
2 |  |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|