Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums |

215-01592 viewsLong Plains, the down passenger train to Alice Springs 'The Ghan' on approach with power from an AN livered DL class DL 37 Clyde Engineering EMD model AT42C serial 88-1245.
|
|

216-08591 viewsDry Creek Yard, a pair of broad gauge V/Line C class locomotives rest between jobs.
|
|

060113 2545589 viewsKevin, narrow gauge locos 1604, NJ 3 and 1601 take the mainline to Thevenard, having reversed train 6DD3 on the Kevin triangle as they prepare to load, 1600 class unit 1604 in Australian Railroad Group livery a Clyde Engineering built EMD JL22C model serial 71-731, originally built as NJ class NJ 4 and built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981. 13th January 2006.
|
|

030414 153424588 viewsPenong very end of the line looking west.
|
|

030415 065626588 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units NJ 5 serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.
|
|

030414 153405582 viewsPenong, looking east from the end of line along the grain loop, 'mainline' peels off to the right, horizontal bunker block 3 on the left with an Ascom silo complex block 1 behind that.
|
|

030405 133016580 viewsWudinna, yard overview looking south with the radial yard crane and loading ramp and the SACBH silo complexes and loading spouts, 5th April 2003.
|
|

030409 080908580 viewsWarramboo, empty grain departs following a crew change. Rebuild unit DA 7 in Australian Southern orange and black livery leads a pair of AE Goodwin built ALCo model DL531 830 class units 872 and 871, the SACBH concrete silo and Ascom silo complexes behind it.
|
|

030414 154350578 viewsPenong, 505.6 km looking east with the goods loop coming in on the right to join the mainline. The car is on the grain loop. Station shelter on the right is where the original barracks were located.
|
|

030409 080705577 viewsWarramboo, empty grain prepares to get underway following a crew change. Rebuild unit DA 7 in Australian Southern orange and black livery leads a pair of AE Goodwin built ALCo model DL531 830 class units 872 and 871, the long disused station building at left and the SACBH concrete silo complex behind.
|
|

217-16576 viewsDry Creek Motive Power Centre, Australian National trio of standard gauge light engines wearing the AN livery with BL class BL 26 'Bob Hawke' Clyde Engineering EMD model JT26C-2SS serial 83-1010, 700 class 705 AE Goodwin ALCo model DL500G serial G6059-3 and CL class Bulldog CL 17 'William McMahon' Clyde Engineering EMD model AT26C serial 71-757.
|
|

030409 080120576 viewsWarramboo, empty grain train stopped for a crew change. Rebuild unit DA 7 in Australian Southern orange and black livery shows its original heritage body style of an NSWGR 48 class 4813 AE Goodwin ALCo model DL531 serial 83713, rebuilt by Islington Workshops SA with long hood and parts from former 830 class 870 AE Goodwin ALCo model DL531 serial G6016-06 in 1998.
|
|

030411 102054576 viewsKimba Grain Bunker, looking towards Kimba with Aerodrome Rd in the distance, ALCo DL531G/1 model rebuilt from an AE Goodwin made ALCo DL531 48 class 4813 serial 83713, issued to Eyre Peninsula from new in March 1966, and two 830 class units, 871 and 872 prepare to depart with a loaded. 11th April 2003. Geodata here.
|
|

060108 2044576 viewsLock, grain train being loaded by former SAR 830 class unit 842, built by AE Goodwin ALCo model DL531 serial 84140 in 1962, originally on broad gauge, transferred to Eyre Peninsula in October 1987 and, 1204 and sister 851.
|
|

030409 080717575 viewsWarramboo, empty grain prepares to get underway following a crew change. Rebuild unit DA 7 in Australian Southern orange and black livery leads a pair of AE Goodwin built ALCo model DL531 830 class units 872 and 871, the relieved crew get in their car with the SACBH concrete silo complex behind.
|
|

030409 083158575 viewsKyancutta, station located at the 203.1 km and originally opened in March 1916, yard overview looking north, grain loop, mainline and goods / grain loop, Ascom silo complex on the left and SACBH concrete silo complex on the right.
|
|

030414 154516575 viewsPenong , goods loop off to the left, grain loop on the right in the grass. Concrete silo block 2 with newer Ascom style complex behind that as Block 1.
|
|

030409 080651574 viewsWarramboo, empty grain prepares to get underway following a crew change. Rebuild unit DA 7 in Australian Southern orange and black livery leads a pair of AE Goodwin built ALCo model DL531 830 class units 872 and 871, the relieved crew get in their car with the SACBH concrete silo complex behind.
|
|

060108 2042574 viewsLock, grain train being loaded by former SAR 830 class unit 842, built by AE Goodwin ALCo model DL531 serial 84140 in 1962, originally on broad gauge, transferred to Eyre Peninsula in October 1987 and, 1204 and sister 851.
|
|

030414 154211572 viewsPenong, yard view looking west with the east leg of the triangle visible curving to the left, goods loop curving right to join the 'mainline' which is under the shrub.
|
|
| 2177 files on 109 page(s) |
 |
 |
 |
5 |  |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|