Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums

Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums
130703_0257.jpg
130703 0257176 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
130704_0400.jpg
130704 0400176 viewsKyancutta, HCN type bogie grain hopper waggon HCN 17, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
130704_0445.jpg
130704 0445176 viewsKyancutta, the south bound loaded grain train gets away from attaching a further fourteen loads here as it crosses the Eyre Highway grade crossing with F Type flashing lights behind 1200 class EMD unit 1204. 4th July 2013.
130704_0450.jpg
130704 0450176 viewsKyancutta, as the train powers away south some examples of the SAR built HAN type of bogie grain waggons lead the front of the rake, sixty eight units were built by South Australian Railways Islington Workshops between 1969 and 1973 for the Eyre Peninsula system. 4th July 2013.
130704_0453.jpg
130704 0453176 viewsKyancutta, HAN type bogie grain hopper waggon HAN 46, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0481.jpg
130704 0481176 viewsKyancutta, HCN type bogie grain hopper waggon HCN 3, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
130704_0484.jpg
130704 0484176 viewsKyancutta, the rear of a south bound loaded grain as it departs with the final five waggons all HCN type bogie grain hoppers converted by SAR Islington Workshops from Tulloch Ltd NSW built NHB type hopper waggons as they cross the Eyre Highway grade crossing and one of the three electric searchlight signals on the network. 4th July 2013.
130704_0487.jpg
130704 0487176 viewsMoule, looking east, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the end of the ballast siding with the crossing loop rejoining the mainline just before the grade crossing to access the ballast stockpile area. Location is here. 4th July 2013.
130705_0540.jpg
130705 0540176 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130708_0739.jpg
130708 0739176 viewsCharra, Charoban Rd grade crossing, 477.8 km.
130708_0782.jpg
130708 0782176 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 25 D, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
130708_0881.jpg
130708 0881176 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.
130708_0886.jpg
130708 0886176 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.
130708_0898.jpg
130708 0898176 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 59 R, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
130708_0901.jpg
130708 0901176 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 49 J, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
130708_0913.jpg
130708 0913176 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 58, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
130708_0931.jpg
130708 0931176 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 51, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
130708_0951.jpg
130708 0951176 viewsThevenard,
161109_1929.jpg
161109 1929176 viewsMoule, originally built by Kinki Sharyo as the NH type for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type in 1984, ENH 16 with hungry boards loaded with gypsum.
161109_1938.jpg
161109 1938176 viewsMoule, originally built by Kinki Sharyo as the NH type for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type in 1984, ENH 2 with hungry boards loaded with gypsum.
2177 files on 109 page(s) 85

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional