Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums |

130704 0426424 viewsKyancutta, south bound loaded grain train seen here testing the brake after picking up more loaded waggons and rejoining the train, with the original goods siding closest to the camera, behind 1200 class EMD G12C model 1204 and twin ALCo DL531 model 830 units 873 and 851. 4th July 2013.
|
|

130705 0538424 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
|
|

130705 0622424 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0645424 viewsLock, type leader of the HBN type dual use ballast / grain hopper waggons, HBN 1, one of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000.
|
|

130705 0652424 viewsLock, 1203, 846 and 859 shunt back into the yard with the second loaded portion, HAN type bogie grain hopper waggon HAN 59, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130708 0791424 viewsCharra, crossing loop, 466.2 km.
|
|

130708 0865424 viewsThevenard, view of arriving loaded train from inside the yard.
|
|

130708 0913424 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 58, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|

060110 2181424 viewsNear the 73 km and Cockaleechie Road grade crossing, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|

161109 1941424 viewsMoule, originally built by Kinki Sharyo as the NH type for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type in 1984, ENH 13 with hungry boards loaded with gypsum.
|
|

161109 1960424 viewsThevenard, train 4DD4 enters the yard behind Genesee & Wyoming locomotive Clyde Engineering EMD model JL22C unit 1601 serial 71-728 as it is about to snake its way across to the GRA siding balloon loop for unloading.
|
|

030404 082810424 viewsPort Germein, Perth bound steel and intermodal hurries through on the main behind National Rail's Goninan built GE Cv40-9i model NR class units NR 30 serial 7250-06 / 97-236 and a sister unit. 4th April 2003.
|
|

030406 142610423 viewsKapinnie, track view looking east towards Yeelanna from the eastern end yard points with grade crossing and 20 km/h speed board. 6th April 2003.
|
|

060109 2132423 viewsKyancutta, ASR 830 class unit 842, an AE Goodwin built ALCo DL531 model loco serial 84140 leads EMD unit 1204 due to air-conditioning trouble and sister ALCo 851 as they re-join the train on the mainline. 9th January 2006.
|
|

060109 2144423 viewsWannamana, on the curve 2 km north of the former station site empty train lead by ASR 830 class unit 842, an AE Goodwin built ALCo DL531 model loco serial 84140 with an EMD 1200 class and a sister ALCo unit. 9th January 2006.
|
|

060111 2369423 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
|
|

060113 2482423 viewsThevenard, empty gypsum train 6DD3 lead by narrow gauge loco 1604 with a triple consist of Clyde Engineering built EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 the original class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 1604 and 1601 both renumbered in 2004 GeoData. 13th January 2006.
|
|

060113 2490423 viewsKevin, the triple NJ-1600 class combination of 1604, NJ 3 and 1601 pull the empty gypsum train 6DD3 along the Penong line prior to reversing around the triangle. 13th January 2006.
|
|

060113 2571423 viewsThevenard, a view of the conveyors and unloading shed of Gypsum Resources Australia (GRA) plant as train 6DD4 commences unloading. 13th January 2006.
|
|

130703 0133423 viewsMurdinga, HCN type bogie grain hopper waggon HCN 20, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here being loaded with grain between two HAN type waggons with Moose Metalworks roll-top cover.
|
|
| 2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
87 |  |
 |
 |
 |
 |
 |
 |
|