Image search results - "71-730" |
030415 065924286 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|
030415 071138219 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.
|
|
030415 071146255 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|
051102 6613250 viewsThevenard Maintenance Centre has NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad and a lone ENH type hopper standing around 'on-shed'.
|
|
051102 6614201 viewsThevenard Maintenance Centre has NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad.
|
|
051102 6615204 viewsThevenard Maintenance Centre overview, with NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad and a lone ENH type hopper standing around 'on-shed'. Behind the sanding plant and shed are the no longer rail serviced grain silos.
|
|
060113 2424105 viewsCeduna, NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad.
|
|
060113 244684 viewsThevenard, NJ class unit NJ 3 a Clyde Engineering built EMD model JL22C serial 71-730, originally built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981. 13th January 2006.
|
|
060113 244786 viewsThevenard, NJ class unit NJ 3 a Clyde Engineering built EMD model JL22C serial 71-730, originally built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981. 13th January 2006.
|
|
060113 249959 viewsKevin, empty train 6DD3 on the stub of the now closed line to Penong shunts back onto the triangle leg to reverse the train prior to loading. 13th January 2006.
|
|
060113 252753 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.
|
|
|
|