Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0255
255-17
At the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata [url=https://goo.gl/maps/DATgFuHfuayyAp8y9]location here[/url]. May 2002.

255-17

At the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.

254-23.jpg 255-14.jpg 255-17.jpg 255-20.jpg 255-22.jpg
Rate this file (No vote yet)
File information
Filename:255-17.jpg
Album name:admin / 0255
Location:162.2 km, WA
Filesize:684 KiB
Date added:Sep 12, 2021
Dimensions:1280 x 853 pixels
Displayed:27 times
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=15737
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional