Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums > 130705
130705 0539
Lock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
Keywords: 1200-class;1203;Clyde-Engineering-Granville-NSW;EMD;G12C;65-427;A-class;A1513;

130705 0539

Lock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.

130705_0537.jpg 130705_0538.jpg 130705_0539.jpg 130705_0540.jpg 130705_0541.jpg
Rate this file (No vote yet)
File information
Filename:130705_0539.jpg
Album name:admin / 130705
Keywords:1200-class / 1203 / Clyde-Engineering-Granville-NSW / EMD / G12C / 65-427 / A-class / A1513 /
Location:Lock, SA
Code and Number:1203
Builder / Type / Model:Clyde Engineering NSW EMD G12C
Serial / Builder's Number:65-427
Filesize:345 KiB
Date added:Jan 27, 2015
Dimensions:1280 x 853 pixels
Displayed:56 times
DateTime Original:2013:07:05 08:08:51
Exposure Time:1/250 sec
FNumber:f/5.6
Focal length:50 mm
Make:Canon
Model:Canon EOS 5D Mark III
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=6595
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional