Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0221
221-16
Hardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.
Keywords: 5669;Goninan;GE;CM40-8EFI;8412-02/95-160;rebuild;Comeng-NSW;ALCo;M636C;5486;C6084-2;

221-16

Hardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.

221-14.jpg 221-15.jpg 221-16.jpg 221-17.jpg 221-18.jpg
Rate this file (No vote yet)
File information
Filename:221-16.jpg
Album name:admin / 0221
Keywords:5669 / Goninan / GE / CM40-8EFI / 8412-02/95-160 / rebuild / Comeng-NSW / ALCo / M636C / 5486 / C6084-2 /
Location:Hardie Siding, WA
Code and Number:5669
Builder / Type / Model:Goninan GE CM40-8MEFI
Serial / Builder's Number:8412-02 / 95-160
Filesize:314 KiB
Date added:Sep 19, 2015
Dimensions:1280 x 844 pixels
Displayed:139 times
Exposure Time:0/1 sec
FNumber:f/0
Focal length:0 mm
Make:Epson
Model:Perfection V700/V750
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=8630
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional