The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.
Moule, yard view looking east from the points for the single ended ballast siding with ballast pile of the left. Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.