Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > Jim_Bisdee_Pilbara_related_images.
3585 001
Bassendean, Wood St, delivery of the final BHP CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160. Unit was rebuilt as one of three with an electronic fuel injected prime mover by Goninan from Comeng built ALCo M636 unit 5486 serial C6084-2. Date July 1995.
Jim Bisdee photo.
Keywords: 5669;Goninan;GE;CM40-8EFI;8412-02/95-160;rebuild;Comeng-NSW;ALCo;M636C;5486;C6084-2;

3585 001

Bassendean, Wood St, delivery of the final BHP CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160. Unit was rebuilt as one of three with an electronic fuel injected prime mover by Goninan from Comeng built ALCo M636 unit 5486 serial C6084-2. Date July 1995.
Jim Bisdee photo.

244-29.jpg 030403_165440.jpg 3585_001.jpg 6997_001_Welshpool_19880819.jpg 030415_171516.jpg
Rate this file (No vote yet)
File information
Filename:3585_001.jpg
Album name:admin / Jim_Bisdee_Pilbara_related_images.
Keywords:5669 / Goninan / GE / CM40-8EFI / 8412-02/95-160 / rebuild / Comeng-NSW / ALCo / M636C / 5486 / C6084-2 /
Location:Bassendean, WA
Code and Number:5669
Builder / Type / Model:Goninan GE CM40-8MEFI
Serial / Builder's Number:8412-02 / 95-160
Filesize:324 KiB
Date added:Nov 17, 2017
Dimensions:1280 x 850 pixels
Displayed:130 times
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=13922
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional