Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > Jim Bisdee Pilbara related images.

1046_001.jpg
1046 00178 viewsWelshpool, Goninan Open Day 27th October, 1988. Brand new GE CM39-8 locomotive 5632 serial 5831-11 / 88-081 under construction for Mt Newman Mining.
Jim Bisdee photo.
1047_001.jpg
1047 00164 viewsWelshpool, Goninan Open Day 27th October, 1988. Brand new Pilbara cab being constructed for GE CM39-8 locomotive 5633 serial 5831-12 / 88-082 under construction for Mt Newman Mining.
Jim Bisdee photo.
1048_001.jpg
1048 00159 viewsWelshpool, Goninan Open Day 27th October, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5632 serial 5831-11 / 88-081 being built for Mt Newman Mining.
Jim Bisdee photo.
1049_001.jpg
1049 00168 viewsWelshpool, Goninan Open Day 27th October, 1988. View of the assembly floor area, brand new GE CM39-8 locomotive 5631 serial 5831-10 / 88-080 under construction for Mt Newman Mining with sister unit 5632 inline behind it.
Jim Bisdee photo.
1050_001.jpg
1050 00164 viewsWelshpool, Goninan Open Day 27th October, 1988. Brand new GE CM39-8 locomotive 5633 serial 5831-12 / 88-082 is only in the early stages of construction for Mt Newman Mining.
Jim Bisdee photo.
1051_001.jpg
1051 00176 viewsWelshpool, Goninan Open Day 27th October, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079 out the front of the workshop on display.
Jim Bisdee photo.
1061_001.jpg
1061 00183 viewsWelshpool, Goninan, Mt Newman Mining's AE Goodwin built ALCo C636 model 5465 serial G6041-1 sits on a road transport float out the front of the workshops, this unit went on to be rebuilt into a GE C36-7M unit 5512. December 1987.
Jim Bisdee photo.
1062_001.jpg
1062 00187 viewsWelshpool, Goninan, Mt Newman Mining's GE C36-7M rebuild unit 5509 serial 4839-05 / 87-074 being road hauled to Port Hedland by Bell on a ninety four wheel float. This unit was rebuild from AE Goodwin ALCo C636 unit 5452 serial G6012-1. May 1987.
Jim Bisdee photo.
15333.jpg
1533371 viewsBassendean, an unidentified Goninan rebuild GE CM40-8M unit for BHP Iron Ore under construction. Date Feb 1994.
Jim Bisdee photo.
16940.jpg
1694071 viewsBassendean, Goninan GE CM40-8M rebuild unit for BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143, rebuilt from Mt Newman Mining AE Goodwin built ALCo M636 unit 5482 serial G6061-3, being prepped for road haulage to Port Hedland. October 1993.
Jim Bisdee photo.
16941.jpg
1694164 viewsBassendean, Goninan GE CM40-8M rebuild unit for BHP Iron Ore 5653 'Chiba' serial 8412-10 / 93-144 sits out the back on shop bogies still under construction in the October 1993 image as the Goninan shunt loco moves the frame of a steam engine. 5653 was rebuilt from Mt Newman Mining AE Goodwin built ALCo M636 5484 serial G6061-5.
Jim Bisdee photo.
16942.jpg
1694252 viewsBassendean, Goninan GE CM40-8M rebuild unit for BHP Iron Ore 5653 'Chiba' serial 8412-10 / 93-144 sits out the back on shop bogies still under construction in the October 1993 image as Westrail P class loco P 2014 looks on.
Jim Bisdee photo.
16943.jpg
1694368 viewsBassendean, Goninan GE CM40-8M rebuild unit for BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143, rebuilt from Mt Newman Mining AE Goodwin built ALCo M636 unit 5482 serial G6061-3, being prepped for road haulage to Port Hedland. October 1993.
Jim Bisdee photo.
16944.jpg
1694454 viewsBassendean, Goninan GE CM40-8M rebuild unit for BHP Iron Ore 5653 'Chiba' serial 8412-10 / 93-144 sits out the back with the shunt loco for company and ALCo 251 engine is in the foreground.
Jim Bisdee photo.
16947.jpg
1694752 viewsBassendean, an overview of the rear of Goninan's workshops, Westrail P class and Mt Newman Mining's AE Goodwin built ALCo M636 unit 5480 serial G6061-1 being prepped for rebuilding into 5658. October 1993.
Jim Bisdee photo.
16948.jpg
1694867 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5480 serial G6061-1 being prepped for rebuilding into 5658. October 1993.
Jim Bisdee photo.
16953.jpg
1695365 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5483 serial G6061-4 being prepped for rebuilding into 5659 with the 251 engine and alternator visible. October 1993.
Jim Bisdee photo.
16954.jpg
1695453 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5483 serial G6061-4 being prepped for rebuilding into 5659 with the 251 engine and alternator visible and other 251's to the right. October 1993.
Jim Bisdee photo.
19794.jpg
1979473 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 2 end. Sept 2003.
Jim Bisdee photo.
19795.jpg
1979556 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 2 end. Sept 2003.
Jim Bisdee photo.
121 files on 7 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2021 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional