Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0232
232-15
Yandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71. February 1997. [url=https://goo.gl/maps/6c1WFqjYSg42]GeoData[/url].
Keywords: 0004;Comeng-NSW;BHP-tank-waggon;

232-15

Yandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71. February 1997. GeoData.

231-05.jpg 231-06.jpg 232-15.jpg 234-06.jpg 235-02.jpg
Rate this file (No vote yet)
File information
Filename:232-15.jpg
Album name:admin / 0232
Keywords:0004 / Comeng-NSW / BHP-tank-waggon /
Location:Yandi One, WA
Code and Number:0004
Builder / Type / Model:Comeng NSW
Filesize:198 KiB
Date added:Mar 21, 2016
Dimensions:1280 x 842 pixels
Displayed:92 times
Exposure Time:0/1 sec
FNumber:f/0
Focal length:0 mm
Make:Epson
Model:Perfection V700/V750
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=9391
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional