232-00118 viewsYandi Two crushing and screening plant, built and operated by Henry Walker for BHP Iron Ore, overview from the radial stacker feed conveyor. From the left is the primary crusher, the dual secondary crushers can be made out behind the tertiary crushers in the middle and the screenhouse is the large building tot he right, the conveyor leading to the right is CV210. February 1997. GeoData.
|
|
![Filename=232-01.jpg
Filesize=342KiB
Dimensions=845x1280
Date added=Mar 21, 2016 232-01.jpg](albums/Pilbara/232/thumb_232-01.jpg)
232-0188 viewsYandi Two entry portal for the loadout tunnel with dust extraction pipes. February 1997. GeoData.
|
|
![Filename=232-02.jpg
Filesize=292KiB
Dimensions=1280x851
Date added=Mar 21, 2016 232-02.jpg](albums/Pilbara/232/thumb_232-02.jpg)
232-0283 viewsYandi Two entry portal for the loadout tunnel entry sign. February 1997. GeoData.
|
|
![Filename=232-03.jpg
Filesize=270KiB
Dimensions=1280x853
Date added=Mar 21, 2016 232-03.jpg](albums/Pilbara/232/thumb_232-03.jpg)
232-0379 viewsYandi Two, view to the stockpile looking west from near the 311.6 km grade crossing. A train can be seen loading on the right. February 1997. GeoData.
|
|
![Filename=232-04.jpg
Filesize=288KiB
Dimensions=1280x851
Date added=Mar 21, 2016 232-04.jpg](albums/Pilbara/232/thumb_232-04.jpg)
232-0484 viewsYandi Two, view west from near the 311.6 km grade crossing, train can be seen loading on the right. February 1997. GeoData.
|
|
![Filename=232-05.jpg
Filesize=282KiB
Dimensions=1280x853
Date added=Mar 21, 2016 232-05.jpg](albums/Pilbara/232/thumb_232-05.jpg)
232-05122 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cab-less unit 5665 'Rotterdam' serial 8412-10 / 94-156, both are Goninan rebuild CM40-8M GE units with 65 having an L on its' designation as cabless with LocoTrol. 3rd February 1997. GeoData.
|
|
![Filename=232-06.jpg
Filesize=282KiB
Dimensions=1280x850
Date added=Mar 21, 2016 232-06.jpg](albums/Pilbara/232/thumb_232-06.jpg)
232-06122 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cabless unit 5665, both are Goninan rebuild CM40-8M GE units, 59 is still in the teal and marigold logo livery. 3rd of February 1997. GeoData.
|
|
![Filename=232-07.jpg
Filesize=431KiB
Dimensions=1280x853
Date added=Mar 21, 2016 232-07.jpg](albums/Pilbara/232/thumb_232-07.jpg)
232-07309 viewsYandi One balloon loop cabless BHP Iron Ore Goninan rebuild CM40-8ML (L for LocoTrol) GE unit 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid-train remote power of train no. 1718 which is partway through loading on the afternoon of 3rd of February 1997. GeoData.
|
|
![Filename=232-08.jpg
Filesize=284KiB
Dimensions=1280x851
Date added=Mar 21, 2016 232-08.jpg](albums/Pilbara/232/thumb_232-08.jpg)
232-08143 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cab-less unit 5665, both are Goninan rebuild CM40-8M GE units, 59 is still in the teal and marigold logo livery. 3rd of February 1997. GeoData.
|
|
![Filename=232-09.jpg
Filesize=277KiB
Dimensions=1280x849
Date added=Mar 21, 2016 232-09.jpg](albums/Pilbara/232/thumb_232-09.jpg)
232-093689 viewsYandi One balloon loop, BHP Iron Ore waggon 2343 built by Comeng WA as one of the second batch of one hundred and eighty three waggons built between 1969 and 1970. The white body panel signifies the rotary coupler end. February 1997. GeoData.
|
|
![Filename=232-10.jpg
Filesize=233KiB
Dimensions=1280x845
Date added=Mar 21, 2016 232-10.jpg](albums/Pilbara/232/thumb_232-10.jpg)
232-10103 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-11.jpg
Filesize=212KiB
Dimensions=1280x842
Date added=Mar 21, 2016 232-11.jpg](albums/Pilbara/232/thumb_232-11.jpg)
232-1181 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-12.jpg
Filesize=286KiB
Dimensions=842x1280
Date added=Mar 21, 2016 232-12.jpg](albums/Pilbara/232/thumb_232-12.jpg)
232-1297 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-13.jpg
Filesize=236KiB
Dimensions=1280x841
Date added=Mar 21, 2016 232-13.jpg](albums/Pilbara/232/thumb_232-13.jpg)
232-13173 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore 50 ton waggon 6703, one of three 'special' waggons converted from Magor USA built ore waggons by the Mt Newman Workshops. February 1997. GeoData.
|
|
![Filename=232-14.jpg
Filesize=228KiB
Dimensions=1280x846
Date added=Mar 21, 2016 232-14.jpg](albums/Pilbara/232/thumb_232-14.jpg)
232-1489 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-15.jpg
Filesize=198KiB
Dimensions=1280x842
Date added=Mar 21, 2016 232-15.jpg](albums/Pilbara/232/thumb_232-15.jpg)
232-1586 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71. February 1997. GeoData.
|
|
![Filename=232-16.jpg
Filesize=219KiB
Dimensions=1280x846
Date added=Mar 21, 2016 232-16.jpg](albums/Pilbara/232/thumb_232-16.jpg)
232-1693 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-17.jpg
Filesize=233KiB
Dimensions=851x1280
Date added=Mar 21, 2016 232-17.jpg](albums/Pilbara/232/thumb_232-17.jpg)
232-1784 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-18.jpg
Filesize=216KiB
Dimensions=1280x848
Date added=Mar 21, 2016 232-18.jpg](albums/Pilbara/232/thumb_232-18.jpg)
232-1884 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-19.jpg
Filesize=312KiB
Dimensions=1280x853
Date added=Mar 21, 2016 232-19.jpg](albums/Pilbara/232/thumb_232-19.jpg)
232-1981 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore loaded Comeng WA built ore waggon 2871 has been re-sheeted with 3CR12 stainless steel side walls. February 1997. GeoData.
|
|
|