Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 01-06_2018
180616 1791
At the 81 km, loaded Bradken China built B series 'master' waggon 20238 with 'slave' waggon 25238, build date April 2013, leading and setup as an instrumented ore waggon, the solar panels are for charging the instrument batteries.
Keywords: 20238;25238;Bradken-China;B-series;

180616 1791

At the 81 km, loaded Bradken China built B series 'master' waggon 20238 with 'slave' waggon 25238, build date April 2013, leading and setup as an instrumented ore waggon, the solar panels are for charging the instrument batteries.

180616_1774.jpg 180616_1790.jpg 180616_1791.jpg 180616_1800r.jpg 180616_1810.jpg
Rate this file (No vote yet)
File information
Filename:180616_1791.jpg
Album name:admin / 01-06_2018
Keywords:20238 / 25238 / Bradken-China / B-series /
Location:Emu Siding, WA
Code and Number:20238
Builder / Type / Model:Bradken China B
Filesize:763 KiB
Date added:Jun 24, 2018
Dimensions:1280 x 853 pixels
Displayed:247 times
DateTime Original:2018:06:16 11:10:28
Exposure Time:1/800 sec
FNumber:f/7.1
Focal length:28 mm
Make:Canon
Model:Canon EOS 5D Mark III
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=14614
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional