Kevin, standing on the mainline to Thevenard, and the train now identified as 6DD4 has commenced loading of gypsum but the 988 Cat front end loaders which takes about one and half hours to load. As the train reversed on the triangle the consist is the same heading back loaded with 1604 leading NJ 3 and 1601. 13th January 2006.