Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0239
239-23
Overview of Yandi One OHP plant as viewed from the head end of CV2 conveyor which runs from the primary crusher to the reclaim pile. Visible from the left is the radial stacker on the stockpile, power station radiators, new and old side tertiary crushing structures, sub-station 4, the workshops in the background and on the secondary crusher structure. The reclaim tunnels and conveyor CV3 are visible running from the bottom of the image to the secondary crusher. [url=https://goo.gl/maps/EyA7dYyg3yK2]GeoData[/url].

239-23

Overview of Yandi One OHP plant as viewed from the head end of CV2 conveyor which runs from the primary crusher to the reclaim pile. Visible from the left is the radial stacker on the stockpile, power station radiators, new and old side tertiary crushing structures, sub-station 4, the workshops in the background and on the secondary crusher structure. The reclaim tunnels and conveyor CV3 are visible running from the bottom of the image to the secondary crusher. GeoData.

239-21.jpg 239-22.jpg 239-23.jpg 239-24.jpg 239-25.jpg
Rate this file (No vote yet)
File information
Filename:239-23.jpg
Album name:admin / 0239
Location:Yandi One, WA
Filesize:441 KiB
Date added:Apr 07, 2016
Dimensions:1280 x 851 pixels
Displayed:140 times
Exposure Time:0/1 sec
FNumber:f/0
Focal length:0 mm
Make:Epson
Model:Perfection V700/V750
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=9672
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional