|
![Filename=030415_065601.jpg
Filesize=332KiB
Dimensions=1280x853
Date added=Jan 27, 2015 030415_065601.jpg](albums/SA_Scans/030415_SA_EP/thumb_030415_065601.jpg)
030415 065601246 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units NJ 5 serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.
|
|
![Filename=030415_065626.jpg
Filesize=296KiB
Dimensions=1280x853
Date added=Jan 27, 2015 030415_065626.jpg](albums/SA_Scans/030415_SA_EP/thumb_030415_065626.jpg)
030415 065626233 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units NJ 5 serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.
|
|
![Filename=030415_065911.jpg
Filesize=407KiB
Dimensions=1280x853
Date added=Jan 27, 2015 030415_065911.jpg](albums/SA_Scans/030415_SA_EP/thumb_030415_065911.jpg)
030415 065911295 viewsKevin, originally one of sixty two Kinki Sharyo built NH type for the NAR in 1966, sent to Eyre Peninsula in 1985 and recoded to ENH type, ENH 11 with hungry boards fitted and loaded with gypsum on train 3DD2 at the Kevin loading point.
|
|
![Filename=030415_065924.jpg
Filesize=386KiB
Dimensions=1280x853
Date added=Jan 27, 2015 030415_065924.jpg](albums/SA_Scans/030415_SA_EP/thumb_030415_065924.jpg)
030415 065924306 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|
![Filename=030415_065944.jpg
Filesize=674KiB
Dimensions=1280x853
Date added=Jan 27, 2015 030415_065944.jpg](albums/SA_Scans/030415_SA_EP/thumb_030415_065944.jpg)
030415 065944305 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit NJ 6 serial 71-733, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|
![Filename=030415_070041.jpg
Filesize=411KiB
Dimensions=1280x853
Date added=Jan 27, 2015 030415_070041.jpg](albums/SA_Scans/030415_SA_EP/thumb_030415_070041.jpg)
030415 070041247 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit serial 71-732, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|
![Filename=030415_070408.jpg
Filesize=343KiB
Dimensions=1280x853
Date added=Jan 27, 2015 030415_070408.jpg](albums/SA_Scans/030415_SA_EP/thumb_030415_070408.jpg)
030415 070408305 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. In the background are the old loading bins. At the Kevin loading point.
|
|
![Filename=030415_070420.jpg
Filesize=482KiB
Dimensions=1280x853
Date added=Jan 27, 2015 030415_070420.jpg](albums/SA_Scans/030415_SA_EP/thumb_030415_070420.jpg)
030415 070420297 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit serial 71-732, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|
![Filename=030415_071138.jpg
Filesize=341KiB
Dimensions=1280x853
Date added=Jan 27, 2015 030415_071138.jpg](albums/SA_Scans/030415_SA_EP/thumb_030415_071138.jpg)
030415 071138233 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.
|
|
![Filename=030415_071146.jpg
Filesize=349KiB
Dimensions=1280x853
Date added=Jan 27, 2015 030415_071146.jpg](albums/SA_Scans/030415_SA_EP/thumb_030415_071146.jpg)
030415 071146268 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|
|
|
|