Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums > 060111

060111_2245.jpg
060111 224582 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
060111_2246.jpg
060111 224679 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
060111_2247.jpg
060111 224773 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
060111_2248.jpg
060111 224871 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
060111_2249.jpg
060111 224975 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
060111_2250.jpg
060111 225073 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
060111_2251.jpg
060111 225175 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
060111_2252.jpg
060111 225276 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
060111_2253.jpg
060111 225370 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
060111_2254.jpg
060111 225472 viewsTooligie, a kilometre south with empty grain train ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
060111_2255.jpg
060111 225571 viewsTooligie, a kilometre south with empty grain train ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
060111_2256.jpg
060111 225673 viewsTooligie, a kilometre south with empty grain train ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
060111_2257.jpg
060111 2257113 viewsTooligie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 and its grain train. 11th January 2006.
060111_2258.jpg
060111 225874 viewsTooligie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 and its grain train. 11th January 2006.
060111_2259.jpg
060111 225972 viewsTooligie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 and its grain train. 11th January 2006.
060111_2260.jpg
060111 226072 viewsTooligie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 and its grain train. 11th January 2006.
060111_2261.jpg
060111 226165 viewsTooligie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 and its grain train. 11th January 2006.
060111_2262.jpg
060111 226263 viewsTooligie, 830 class unit 850 serial 84136 an AE Goodwin built ALCo DL531 model for the SAR and delivered new to Port Lincoln in 1962. 11th January 2006.
060111_2263.jpg
060111 226368 viewsTooligie, at the Tooligie Road grade crossing, ARG 900 class unit 905, originally built by AE Goodwin as 830 class unit 836 serial 83727, converted to DA class DA 6 by Australian National at Port Augusta workshops for driver only operation in 1996. Trailing unit in a north bound grain train. 11th January 2006.
060111_2264.jpg
060111 226460 viewsTooligie, at the Tooligie Road grade crossing, the empty grain train continues north towards Murdinga. 11th January 2006.
168 files on 9 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2021 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional