|

060111 2285301 viewsMurdinga, rounding the curve before entering the station environs empty grain train running north behind ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004. 11th January 2006.
|
|

060111 2286314 viewsMurdinga, empty grain train running through the station with the grain silos and loadout spout. 11th January 2006.
|
|

060111 2287269 viewsMurdinga, empty grain train running through the station with the grain silos and loadout spout. 11th January 2006.
|
|

060111 2288295 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.
|
|

060111 2289288 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.
|
|

060111 2290306 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.
|
|

060111 2291305 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.
|
|

060111 2292266 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.
|
|

060111 2293308 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.
|
|

060111 2294302 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2295506 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2296335 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2297312 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2298293 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2299289 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2300308 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2301257 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2302284 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo as they pass the 147 km post. 11th January 2006.
|
|

060111 2303281 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2304273 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.
|
|
|