|

060111 2285268 viewsMurdinga, rounding the curve before entering the station environs empty grain train running north behind ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004. 11th January 2006.
|
|

060111 2286258 viewsMurdinga, empty grain train running through the station with the grain silos and loadout spout. 11th January 2006.
|
|

060111 2287229 viewsMurdinga, empty grain train running through the station with the grain silos and loadout spout. 11th January 2006.
|
|

060111 2288263 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.
|
|

060111 2289239 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.
|
|

060111 2290262 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.
|
|

060111 2291258 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.
|
|

060111 2292229 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.
|
|

060111 2293268 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.
|
|

060111 2294264 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2295415 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2296284 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2297267 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2298253 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2299254 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2300259 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2301219 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2302245 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo as they pass the 147 km post. 11th January 2006.
|
|

060111 2303244 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2304236 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.
|
|
|