Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums > 060111

060111_2345.jpg
060111 234576 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2346.jpg
060111 234695 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2347.jpg
060111 234791 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2348.jpg
060111 234886 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2349.jpg
060111 234986 viewsKyancutta, ARG 900 class unit 905, originally built by AE Goodwin as 830 class unit 836 serial 83727, converted to DA class DA 6 by Australian National at Port Augusta workshops for driver only operation in 1996. Trailing unit in a north bound grain train. 11th January 2006.
060111_2350.jpg
060111 235079 viewsKyancutta, empty grain waggons being shunted, SAR Islington Workshops built HAN type bogie wheat waggons HAN 34 with ANR logo, while HAN 15 still has the SAR logo. 11th January 2006.
060111_2351.jpg
060111 235177 viewsKyancutta, HCN type bogie wheat waggon HCN 3 shows signs of new panel work, was modified at Islington Workshops in 1978-80 and started life as a Tulloch built NHB type iron ore hopper for the CR on the North Australia Railway in 1968-69, and an SAR built HAN type HAN 13 part of an empty grain train. 11th January 2006.
060111_2352.jpg
060111 235279 viewsKyancutta, former Australian National narrow gauge ENHG type bogie grain waggon ENHG 3, originally built by Moore Road Ind, Victoria as NB type NB 1398 ballast hopper for the NAR, then to standard gauge in 1975 as BA type BA 1540, recoded to AHTY in 1980, to EP April 1984, recoded to NHG type NHG 6 in May 1984, then again to ENHT type ENHT 6 in March 1985 and further rebuilt forming one half of ENHG type grain waggon in August 1986. The conversion involved splicing two AHTY-ENHT type waggons together at Port Lincoln workshops, roll top cover visible, part of an empty train. 11th January 2006.
060111_2353.jpg
060111 235384 viewsKyancutta, this shot shows three of the types of waggon used, former Australian National narrow gauge ENHG type bogie grain waggon ENHG 3, originally built by Moore Road Ind, Victoria as NB type NB 1398 ballast hopper for the NAR, then to standard gauge in 1975 as BA type BA 1540, recoded to AHTY in 1980, to EP April 1984, recoded to NHG type NHG 6 in May 1984, then again to ENHT type ENHT 6 in March 1985 and further rebuilt forming one half of ENHG type grain waggon in August 1986. The conversion involved splicing two AHTY-ENHT type waggons together at Port Lincoln workshops, an HCN type HCN 4, was modified at Islington Workshops in 1978-80 and started life as a Tulloch built NHB type iron ore hopper for the CR on the North Australia Railway in 1968-69, and an SAR built HAN type as they are shunted back into the grain siding for loading. 11th January 2006.
060111_2354.jpg
060111 235489 viewsKyancutta, this shot shows three of the types of waggon used, former Australian National narrow gauge ENHG type bogie grain waggon ENHG 3, originally built by Moore Road Ind, Victoria as NB type NB 1398 ballast hopper for the NAR, then to standard gauge in 1975 as BA type BA 1540, recoded to AHTY in 1980, to EP April 1984, recoded to NHG type NHG 6 in May 1984, then again to ENHT type ENHT 6 in March 1985 and further rebuilt forming one half of ENHG type grain waggon in August 1986. The conversion involved splicing two AHTY-ENHT type waggons together at Port Lincoln workshops, an HCN type HCN 4 was modified at Islington Workshops in 1978-80 and started life as a Tulloch built NHB type iron ore hopper for the CR on the North Australia Railway in 1968-69, and an SAR built HAN type as they are shunted back into the grain siding for loading. 11th January 2006.
060111_2355.jpg
060111 235588 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2356.jpg
060111 235698 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2357.jpg
060111 235780 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2358.jpg
060111 235876 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2359.jpg
060111 235978 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2360.jpg
060111 236073 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2361.jpg
060111 236183 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2362.jpg
060111 236294 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2363.jpg
060111 2363107 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
060111_2364.jpg
060111 236497 viewsKyancutta, ARG 900 class unit 905, originally built by AE Goodwin as 830 class unit 836 serial 83727, converted to DA class DA 6 by Australian National at Port Augusta workshops for driver only operation in 1996. Trailing unit in a north bound grain train. 11th January 2006.
168 files on 9 page(s) 6

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional