Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums > 130705

130705_0530.jpg
130705 053049 viewsLock, cab view of Genesee & Wyoming locomotive AE Goodwin ALCo model DL531 unit 859 'City of Port Lincoln' serial 84705, built in 1963, 859 started life at Peterborough, spent some years in Tasmania and even spent time in Perth on standard gauge in 2002 before being repainted and transferred to the Eyre Peninsula system in 2003. 5th of July 2013.
130705_0531.jpg
130705 053144 viewsLock, cab view of Genesee & Wyoming locomotive AE Goodwin ALCo model DL531 unit 859 'City of Port Lincoln' serial 84705, built in 1963, 859 started life at Peterborough, spent some years in Tasmania and even spent time in Perth on standard gauge in 2002 before being repainted and transferred to the Eyre Peninsula system in 2003. 5ht of July 2013.
130705_0532.jpg
130705 053245 viewsLock, hood view of the Genesee & Wyoming decal on locomotive AE Goodwin ALCo model DL531 unit 859 'City of Port Lincoln' serial 84705, built in 1963, 859 started life at Peterborough, spent some years in Tasmania and even spent time in Perth on standard gauge in 2002 before being repainted and transferred to the Eyre Peninsula system in 2003. 5th of July 2013.
130705_0533.jpg
130705 053354 viewsLock, cab view of former Australian National narrow gauge 830 class locomotive 846, an AE Goodwin built ALCo DL531 model with serial 84715 built new for the SAR in 1963 and delivered to Adelaide Division on broad gauge, transferred to Tasmania on narrow gauge in 1982, then back to SA on standard gauge in 1989 and then Whyalla in 2008 on narrow gauge. In 2012 is was delivered to Port Lincoln, the last loco delivered to the Eyre Peninsula and wearing Genesee & Wyoming decals on former AN livery. 5th July 2013.
130705_0534.jpg
130705 053449 viewsLock, cab and roof view of former Australian National narrow gauge 830 class locomotive 846, an AE Goodwin built ALCo DL531 model with serial 84715 built new for the SAR in 1963 and delivered to Adelaide Division on broad gauge, transferred to Tasmania on narrow gauge in 1982, then back to SA on standard gauge in 1989 and then Whyalla in 2008 on narrow gauge. In 2012 is was delivered to Port Lincoln, the last loco delivered to the Eyre Peninsula and wearing Genesee & Wyoming decals on former AN livery. 5th July 2013.
130705_0535.jpg
130705 053550 viewsLock, cab view through windows of former Australian National narrow gauge 830 class locomotive 846, an AE Goodwin built ALCo DL531 model with serial 84715 built new for the SAR in 1963 and delivered to Adelaide Division on broad gauge, transferred to Tasmania on narrow gauge in 1982, then back to SA on standard gauge in 1989 and then Whyalla in 2008 on narrow gauge. In 2012 is was delivered to Port Lincoln, the last loco delivered to the Eyre Peninsula. 5th July 2013.
130705_0536.jpg
130705 053658 viewsLock, side view of Genesee & Wyoming 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
130705_0537.jpg
130705 053740 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0538.jpg
130705 053848 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0539.jpg
130705 053937 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0540.jpg
130705 054061 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0541.jpg
130705 054138 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0542.jpg
130705 054246 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0543.jpg
130705 054342 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0544.jpg
130705 054440 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0545.jpg
130705 054541 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0546.jpg
130705 054642 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0547.jpg
130705 054744 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0548.jpg
130705 054846 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0549.jpg
130705 054938 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
156 files on 8 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional