Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums > 130705

130705_0590.jpg
130705 0590372 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
130705_0591.jpg
130705 0591360 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
130705_0592.jpg
130705 0592335 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1.
130705_0593.jpg
130705 0593344 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1.
130705_0594.jpg
130705 0594352 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.
130705_0595.jpg
130705 0595338 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.
130705_0596.jpg
130705 0596345 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.
130705_0597.jpg
130705 0597352 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
130705_0598.jpg
130705 0598343 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
130705_0599.jpg
130705 0599353 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
130705_0600.jpg
130705 0600361 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
130705_0601.jpg
130705 0601353 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.
130705_0602.jpg
130705 0602355 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
130705_0603.jpg
130705 0603423 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left is the concrete toilet block, Ascom silo complex (Block 5), the train is loading on the grain loop, loaded rake on the mainline, horizontal bunker (Block 4) and the crew barracks. 5th July 2013.
130705_0604.jpg
130705 0604310 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.
130705_0605.jpg
130705 0605423 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.
130705_0606.jpg
130705 0606381 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.
130705_0607.jpg
130705 0607424 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.
130705_0608.jpg
130705 0608422 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.
130705_0609.jpg
130705 0609366 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
156 files on 8 page(s) 5

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional