|

130705 061089 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
|
|

130705 061183 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
|
|

130705 061285 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 061388 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 061494 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 061589 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 061688 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 061789 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 061885 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 061983 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 062098 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 062183 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 062287 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 062389 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 062481 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 062579 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 062684 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 062781 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 across Birdseye Hwy as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 062881 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 062987 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|
|