Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums > 130705

130705_0610.jpg
130705 0610324 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
130705_0611.jpg
130705 0611269 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
130705_0612.jpg
130705 0612296 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0613.jpg
130705 0613273 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0614.jpg
130705 0614270 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0615.jpg
130705 0615257 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0616.jpg
130705 0616256 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0617.jpg
130705 0617287 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0618.jpg
130705 0618259 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0619.jpg
130705 0619274 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0620.jpg
130705 0620290 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0621.jpg
130705 0621260 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0622.jpg
130705 0622301 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0623.jpg
130705 0623281 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0624.jpg
130705 0624253 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0625.jpg
130705 0625290 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0626.jpg
130705 0626265 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0627.jpg
130705 0627282 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 across Birdseye Hwy as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0628.jpg
130705 0628253 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0629.jpg
130705 0629242 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
156 files on 8 page(s) 6

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional