|
![Filename=221-01.jpg
Filesize=377KiB
Dimensions=1280x851
Date added=Sep 19, 2015 221-01.jpg](albums/Pilbara/221/thumb_221-01.jpg)
221-01170 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.
|
|
![Filename=221-02.jpg
Filesize=366KiB
Dimensions=1280x853
Date added=Sep 19, 2015 221-02.jpg](albums/Pilbara/221/thumb_221-02.jpg)
221-02162 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.
|
|
![Filename=221-03.jpg
Filesize=356KiB
Dimensions=1280x853
Date added=Sep 19, 2015 221-03.jpg](albums/Pilbara/221/thumb_221-03.jpg)
221-03278 viewsHardie Siding, with the days of Goninan GE rebuilt C36-7M units operating numbered, 5513 serial 88-078 / 4839-02 rebuilt from AE Goodwin ALCo C636 5453 serial G6012-2, the drivers side cab 'Kalgan' nameplate has already removed to be fitted to the new GE AC6000 6074.
|
|
![Filename=221-04.jpg
Filesize=363KiB
Dimensions=1280x853
Date added=Sep 19, 2015 221-04.jpg](albums/Pilbara/221/thumb_221-04.jpg)
221-04156 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.
|
|
![Filename=221-05.jpg
Filesize=348KiB
Dimensions=1280x853
Date added=Sep 19, 2015 221-05.jpg](albums/Pilbara/221/thumb_221-05.jpg)
221-05161 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.
|
|
![Filename=221-06.jpg
Filesize=388KiB
Dimensions=1280x853
Date added=Sep 19, 2015 221-06.jpg](albums/Pilbara/221/thumb_221-06.jpg)
221-06132 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.
|
|
![Filename=221-07.jpg
Filesize=391KiB
Dimensions=1280x853
Date added=Sep 19, 2015 221-07.jpg](albums/Pilbara/221/thumb_221-07.jpg)
221-07146 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.
|
|
![Filename=221-08.jpg
Filesize=361KiB
Dimensions=1280x853
Date added=Sep 19, 2015 221-08.jpg](albums/Pilbara/221/thumb_221-08.jpg)
221-08142 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.
|
|
![Filename=221-09.jpg
Filesize=352KiB
Dimensions=1280x853
Date added=Sep 19, 2015 221-09.jpg](albums/Pilbara/221/thumb_221-09.jpg)
221-09233 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.
|
|
![Filename=221-10.jpg
Filesize=327KiB
Dimensions=1280x844
Date added=Sep 19, 2015 221-10.jpg](albums/Pilbara/221/thumb_221-10.jpg)
221-10132 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 heads away from Hardie past the location equipment and the train crew shelter with a loaded train bound for Finucane Island.
|
|
![Filename=221-11.jpg
Filesize=353KiB
Dimensions=1280x845
Date added=Sep 19, 2015 221-11.jpg](albums/Pilbara/221/thumb_221-11.jpg)
221-11145 viewsHardie Siding, with the switch now set for the siding, the empty train is reversing out back onto the mainline, the ore cars are Tomlinson Steel built bottom discharge units. Note the end of train device are two flashing red lights, and no digitair.
|
|
![Filename=221-12.jpg
Filesize=355KiB
Dimensions=1280x845
Date added=Sep 19, 2015 221-12.jpg](albums/Pilbara/221/thumb_221-12.jpg)
221-12122 viewsHardie Siding, with the switch now set for the siding, the empty train is reversing out back onto the mainline, the ore cars are Tomlinson Steel built bottom discharge units.
|
|
![Filename=221-13.jpg
Filesize=350KiB
Dimensions=1280x848
Date added=Sep 19, 2015 221-13.jpg](albums/Pilbara/221/thumb_221-13.jpg)
221-13126 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02 is backing out onto the mainline with an empty train that will continue onto Yarrie for loading.
|
|
![Filename=221-14.jpg
Filesize=363KiB
Dimensions=1280x848
Date added=Sep 19, 2015 221-14.jpg](albums/Pilbara/221/thumb_221-14.jpg)
221-14133 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.
|
|
![Filename=221-15.jpg
Filesize=345KiB
Dimensions=1280x844
Date added=Sep 19, 2015 221-15.jpg](albums/Pilbara/221/thumb_221-15.jpg)
221-15136 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.
|
|
![Filename=221-16.jpg
Filesize=314KiB
Dimensions=1280x844
Date added=Sep 19, 2015 221-16.jpg](albums/Pilbara/221/thumb_221-16.jpg)
221-16132 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.
|
|
![Filename=221-17.jpg
Filesize=338KiB
Dimensions=1280x848
Date added=Sep 19, 2015 221-17.jpg](albums/Pilbara/221/thumb_221-17.jpg)
221-17119 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.
|
|
![Filename=221-18.jpg
Filesize=354KiB
Dimensions=1280x850
Date added=Sep 19, 2015 221-18.jpg](albums/Pilbara/221/thumb_221-18.jpg)
221-18110 viewsHardie Siding, as the train continues, Gunderson USA smooth sided cars and Portec USA ribbed sided cars make up the front portion of the train.
|
|
![Filename=221-19.jpg
Filesize=390KiB
Dimensions=1280x852
Date added=Sep 19, 2015 221-19.jpg](albums/Pilbara/221/thumb_221-19.jpg)
221-19113 viewsHardie Siding, Tomlinson Steel cars make up the bulk of the fleet and the rear portions of the Goldsworthy Line trains.
|
|
![Filename=221-20.jpg
Filesize=423KiB
Dimensions=1280x849
Date added=Sep 19, 2015 221-20.jpg](albums/Pilbara/221/thumb_221-20.jpg)
221-20127 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal as it leads a train through the loading vaults, the dust extraction ducting is also visible and the plant stacker can been seen at the very top of the stockpile.
|
|
|