|
![Filename=229-00.jpg
Filesize=373KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-00.jpg](albums/Pilbara/229/thumb_229-00.jpg)
229-0087 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
|
|
![Filename=229-01.jpg
Filesize=394KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-01.jpg](albums/Pilbara/229/thumb_229-01.jpg)
229-0182 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
|
|
![Filename=229-02.jpg
Filesize=360KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-02.jpg](albums/Pilbara/229/thumb_229-02.jpg)
229-0287 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
|
|
![Filename=229-03.jpg
Filesize=296KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-03.jpg](albums/Pilbara/229/thumb_229-03.jpg)
229-03268 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with 5650 'Yawata' serial 8412-07 / 93-141 leading sister unit 5642, grade crossing is the YT 311.5 km. GeoData.
|
|
![Filename=229-04.jpg
Filesize=405KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-04.jpg](albums/Pilbara/229/thumb_229-04.jpg)
229-0498 viewsYandi Two at the 311.5 km with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with second unit 5642 'Wallareenya' serial 8281-07 / 92-131 trailing sister unit 5650. GeoData.
|
|
![Filename=229-05.jpg
Filesize=426KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-05.jpg](albums/Pilbara/229/thumb_229-05.jpg)
229-0580 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout with mid-train remote units Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151 leading sister unit 5657, grade crossing is the YT 311.5 km. GeoData.
|
|
![Filename=229-06.jpg
Filesize=420KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-06.jpg](albums/Pilbara/229/thumb_229-06.jpg)
229-0687 viewsYandi Two at the 311.5 km with an empty BHP train heading for the loadout behind mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing lead remote sister unit 5660. GeoData.
|
|
![Filename=229-07.jpg
Filesize=353KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-07.jpg](albums/Pilbara/229/thumb_229-07.jpg)
229-0781 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout with mid-train remote units Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151 leading sister unit 5657, note the sheet metal windscreen protector plates, grade crossing is the YT 311.5 km. GeoData.
|
|
![Filename=229-08.jpg
Filesize=348KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-08.jpg](albums/Pilbara/229/thumb_229-08.jpg)
229-0888 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151, cab side. GeoData.
|
|
![Filename=229-09.jpg
Filesize=387KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-09.jpg](albums/Pilbara/229/thumb_229-09.jpg)
229-0982 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit. GeoData.
|
|
![Filename=229-0A.jpg
Filesize=397KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-0A.jpg](albums/Pilbara/229/thumb_229-0A.jpg)
229-0A86 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
|
|
![Filename=229-10.jpg
Filesize=382KiB
Dimensions=853x1280
Date added=Nov 13, 2015 229-10.jpg](albums/Pilbara/229/thumb_229-10.jpg)
229-1084 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.
|
|
![Filename=229-11.jpg
Filesize=377KiB
Dimensions=853x1280
Date added=Nov 13, 2015 229-11.jpg](albums/Pilbara/229/thumb_229-11.jpg)
229-1181 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.
|
|
![Filename=229-12.jpg
Filesize=360KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-12.jpg](albums/Pilbara/229/thumb_229-12.jpg)
229-1285 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit, cab side. GeoData.
|
|
![Filename=229-13.jpg
Filesize=418KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-13.jpg](albums/Pilbara/229/thumb_229-13.jpg)
229-1381 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151. GeoData.
|
|
![Filename=229-14.jpg
Filesize=410KiB
Dimensions=853x1280
Date added=Nov 13, 2015 229-14.jpg](albums/Pilbara/229/thumb_229-14.jpg)
229-1479 viewsYandi Two loadout, looking through the tunnel and the CM40-8M profile of 5650 can be just made out, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, Yandi Two features to loadout vaults for extra capacity, in later years it allowed two different products, fines and lumps to be stacked. GeoData.
|
|
![Filename=229-15.jpg
Filesize=376KiB
Dimensions=853x1280
Date added=Nov 13, 2015 229-15.jpg](albums/Pilbara/229/thumb_229-15.jpg)
229-1585 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
|
|
![Filename=229-16.jpg
Filesize=400KiB
Dimensions=853x1280
Date added=Nov 13, 2015 229-16.jpg](albums/Pilbara/229/thumb_229-16.jpg)
229-1681 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
|
|
![Filename=229-17.jpg
Filesize=409KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-17.jpg](albums/Pilbara/229/thumb_229-17.jpg)
229-1786 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.
|
|
![Filename=229-18.jpg
Filesize=380KiB
Dimensions=1280x853
Date added=Nov 13, 2015 229-18.jpg](albums/Pilbara/229/thumb_229-18.jpg)
229-1884 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.
|
|
|