|
![Filename=232-20.jpg
Filesize=366KiB
Dimensions=1280x853
Date added=Mar 21, 2016 232-20.jpg](albums/Pilbara/232/thumb_232-20.jpg)
232-2064 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore loaded Comeng WA built ore waggon 2871 has been re-sheeted with 3CR12 stainless steel side walls, view of broken coupler. February 1997. GeoData.
|
|
![Filename=232-21.jpg
Filesize=265KiB
Dimensions=1280x853
Date added=Mar 21, 2016 232-21.jpg](albums/Pilbara/232/thumb_232-21.jpg)
232-2164 viewsYandi One loadout portal as a train is being loaded. Waggons are from left, a 3CR12 re-sheeted Comeng, an Oroville built by Magor USA and a standard Comeng WA build. 18th of February 1997. GeoData.
|
|
![Filename=232-22.jpg
Filesize=210KiB
Dimensions=1280x850
Date added=Mar 21, 2016 232-22.jpg](albums/Pilbara/232/thumb_232-22.jpg)
232-2272 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
|
|
![Filename=232-23.jpg
Filesize=199KiB
Dimensions=1280x847
Date added=Mar 21, 2016 232-23.jpg](albums/Pilbara/232/thumb_232-23.jpg)
232-2363 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
|
|
![Filename=232-24.jpg
Filesize=213KiB
Dimensions=1280x847
Date added=Mar 21, 2016 232-24.jpg](albums/Pilbara/232/thumb_232-24.jpg)
232-2472 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
|
|
![Filename=232-25.jpg
Filesize=203KiB
Dimensions=1280x846
Date added=Mar 21, 2016 232-25.jpg](albums/Pilbara/232/thumb_232-25.jpg)
232-2569 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
|
|
![Filename=232-26.jpg
Filesize=225KiB
Dimensions=1280x842
Date added=Mar 21, 2016 232-26.jpg](albums/Pilbara/232/thumb_232-26.jpg)
232-26149 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggon 2502 is a standard Comeng WA build from the third batch of 180 waggons built in 1970. Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 leads a LocoTrol remote unit built with no cab, a CM40-8ML 5665. 18th of February 1997. GeoData.
|
|
![Filename=232-27.jpg
Filesize=213KiB
Dimensions=1280x838
Date added=Mar 21, 2016 232-27.jpg](albums/Pilbara/232/thumb_232-27.jpg)
232-2771 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
|
|
![Filename=232-28.jpg
Filesize=216KiB
Dimensions=1280x842
Date added=Mar 21, 2016 232-28.jpg](albums/Pilbara/232/thumb_232-28.jpg)
232-2867 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
|
|
![Filename=232-29.jpg
Filesize=234KiB
Dimensions=1280x842
Date added=Mar 21, 2016 232-29.jpg](albums/Pilbara/232/thumb_232-29.jpg)
232-2981 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 leads a LocoTrol remote unit built with no cab, a CM40-8ML 5665. 18th of February 1997. GeoData.
|
|
![Filename=232-30.jpg
Filesize=258KiB
Dimensions=844x1280
Date added=Mar 21, 2016 232-30.jpg](albums/Pilbara/232/thumb_232-30.jpg)
232-3071 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
|
|
![Filename=232-31.jpg
Filesize=224KiB
Dimensions=1280x842
Date added=Mar 21, 2016 232-31.jpg](albums/Pilbara/232/thumb_232-31.jpg)
232-3171 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.
|
|
![Filename=232-32.jpg
Filesize=233KiB
Dimensions=1280x842
Date added=Mar 21, 2016 232-32.jpg](albums/Pilbara/232/thumb_232-32.jpg)
232-32107 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|
![Filename=232-33.jpg
Filesize=233KiB
Dimensions=1280x845
Date added=Mar 21, 2016 232-33.jpg](albums/Pilbara/232/thumb_232-33.jpg)
232-33116 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|
![Filename=232-34.jpg
Filesize=253KiB
Dimensions=1280x856
Date added=Mar 21, 2016 232-34.jpg](albums/Pilbara/232/thumb_232-34.jpg)
232-34117 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.
|
|
![Filename=232-35.jpg
Filesize=241KiB
Dimensions=1280x846
Date added=Mar 21, 2016 232-35.jpg](albums/Pilbara/232/thumb_232-35.jpg)
232-35102 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.
|
|
![Filename=232-36.jpg
Filesize=267KiB
Dimensions=1280x849
Date added=Mar 21, 2016 232-36.jpg](albums/Pilbara/232/thumb_232-36.jpg)
232-36156 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|
![Filename=232-37.jpg
Filesize=412KiB
Dimensions=1280x853
Date added=Mar 21, 2016 232-37.jpg](albums/Pilbara/232/thumb_232-37.jpg)
232-37331 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|
|
|
|