BHP_Rolling_Stock_-_Non_Ore
|
|
|

050724 4234528 viewsNelson Point yard, flat waggons in service on the Pony re-laying train as transport waggons for sleepers, with a gantry car delivering concrete sleepers to replace the removed steel sleepers. The middle waggon is an ex Goldsworthy Mining flat waggon with a Scotts of Ipswich built flat either side, built in 1970 for then Mt Newman Mining Company.
|
|

050724 4237517 viewsNelson Point yard, flat waggons in service on the Pony re-laying train as transport waggons for sleepers, with a gantry car delivering concrete sleepers to replace the removed steel sleepers. The left waggon is an ex Goldsworthy Mining flat waggon with a Scotts of Ipswich built flat waggon with the gantry car on it, built in 1970 for then Mt Newman Mining Company.
|
|

050724 4243552 viewsNelson Point yard, flat waggons in service on the Pony re-laying train as transport waggons for sleepers, with a gantry car sitting atop a heavily modified and cut down Oroville waggon, with the left waggon a Scotts of Ipswich built flat waggon from in 1970 for then Mt Newman Mining Company.
|
|

0508 Magor USA 050518 2188514 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 508, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0508 Magor USA 050518 2189506 viewsBing Siding. Side view of 1963 built Magor USA waggon 508, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0509 Magor USA 041012 082946494 viewsBing Siding, one of twenty original Oroville Dam waggons built by Magor USA in 1963, sold to Mt Newman Mining in 1968, ballast waggon 509 (of 501-520) still in near delivered condition. Note the access ladder and the weld line where the internal plates are for bottom discharge of ballast.
|
|

0510 Mt Newman Mining Workshops 040806 091220591 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a test waggon.
|
|

0510 Mt Newman Mining Workshops 040806 092738496 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a weighbridge test waggon. The others in the fleet are 40, 60 and 100 tons.
|
|

0510 Mt Newman Mining Workshops 060414 3442555 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 510 seen here modified as a weighbridge test car. The others in the fleet are 40, 60 and 100 tons. April 14, 2006.
|
|

0510 Mt Newman Mining Workshops 060414 3443540 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 510 seen here modified as a weighbridge test car. The others in the fleet are 40, 60 and 100 tons. April 14, 2006.
|
|

051001 5682496 viewsBoodarie, the Steel Train or rail recovery and transport train holds the main towards Finucane Island, a loaded rake of Comeng WA and Scotts of Ipswich Qld flat waggons make up the consist.
|
|

0512 Magor USA 050412 0758469 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 512.
|
|

0512 Magor USA 050412 0761440 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 512.
|
|

0512 Magor USA 050518 2176498 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 512, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0512 Magor USA 050518 2177505 viewsBing Siding. Side view of 1963 built Magor USA waggon 512, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0513 Magor USA 050412 0735477 viewsQuarry 8, Shaw Siding area. A dash 8 locomotive on the point of an empty ballast waggon rake awaiting loading, waggons are modified Magor USA built ore waggons from the Oroville Dam construction.
|
|

0513 Magor USA 050421 1386445 viewsQuarry 8, Magor USA built ballast waggon 513, originally built in 1963 for the Oroville Dam project, before coming to BHP second hand as a ballast waggon in January 1968.
|
|

0513 Magor USA 050421 1387442 viewsQuarry 8, Magor USA built ballast waggon 513, originally built in 1963 for the Oroville Dam project, before coming to BHP second hand as a ballast waggon in January 1968.
|
|

0513 Magor USA 050518 2190441 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 513, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0513 Magor USA 050518 2191496 viewsBing Siding. Side view of 1963 built Magor USA waggon 513, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|
| 822 files on 42 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
13 |  |
 |
 |
 |
 |
 |
 |
|