Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > BHP_Rolling_Stock_-_Non_Ore

050319_0138.jpg
050319 013879 viewsNelson Point, cut down Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the steel train.
050319_0139.jpg
050319 0139122 viewsNelson Point, a heavily cut down and modified Magor USA ore waggon, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
050319_0140.jpg
050319 014073 viewsNelson Point, cut down Magor USA built former Oroville Dam 91 ton ore waggon 665, now used as the crib waggon on the steel train, 3/4 view.
050319_0141.jpg
050319 014173 viewsNelson Point, cut down Magor USA built former Oroville Dam 91 ton ore waggon 665, now used as the crib waggon on the steel train, side view.
050319_0142.jpg
050319 014270 viewsNelson Point, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
050319_0143.jpg
050319 014370 viewsNelson Point, rail recovery and transport train, 2nd lead off waggon 6201, built by Comeng WA, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
050319_0144.jpg
050319 014473 viewsNelson Point, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
050319_0149.jpg
050319 014976 viewsNelson Point, dumper pilot SD40 3080 with compressor waggon set #1, made up of spacer/ballast waggon 681 and compressor waggon 671, both converted from original Magor built 91 ton ore waggons, painted white.
050410_0536.jpg
050410 053674 viewsNelson Point, tanker filling area, fuel tank waggon 0018, a Comeng WA built 114 kilolitre tank waggon, one of a batch of three built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
050410_0537.jpg
050410 053774 viewsNelson Point, tanker filling area, fuel tank waggon 0018, a Comeng WA built 114 kilolitre tank waggon, one of a batch of three built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
050410_0540.jpg
050410 054070 viewsNelson Point, tanker filling area, fuel tank waggon 0015, a Comeng NSW built 112 kilolitre tank waggon, one of a batch of four built in 1972 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
050410_0542.jpg
050410 054271 viewsNelson Point, tanker filling area, fuel tank waggon 0015, a Comeng NSW built 112 kilolitre tank waggon, one of a batch of four built in 1972 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
050410_0545.jpg
050410 054573 viewsNelson Point, tanker filling area, fuel tank waggons 0018 a Comeng WA built 114 kilolitre tank waggon, one of a batch of three built in 1974-75 and 0015 a Comeng NSW built 112 kilolitre tank waggon, one of a batch of four built in 1972 and both wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
050412_0735.jpg
050412 073576 viewsQuarry 8, Shaw Siding area. A dash 8 locomotive on the point of an empty ballast waggon rake awaiting loading, waggons are modified Magor USA built ore waggons from the Oroville Dam construction.
050412_0737.jpg
050412 073774 viewsQuarry 8, Shaw Siding area. A dash 8 locomotive 5665 on the point of an empty ballast waggon rake awaiting loading, waggon 504 is a modified Magor USA built ore waggon from 1963 and from the Oroville Dam construction.
050412_0750.jpg
050412 075074 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA waggon 527, originally in ore service before conversion to a ballast waggon.
050412_0751.jpg
050412 075163 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 532, originally in ore service before conversion to a ballast waggon.
050412_0752.jpg
050412 075275 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA waggon 534, originally in ore service before conversion to a ballast waggon.
050412_0753.jpg
050412 075365 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 527, originally in ore service before conversion to a ballast waggon.
050412_0754.jpg
050412 075467 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 517.
797 files on 40 page(s) 6

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional