249-01180 viewsYule River road crossing on the former Hedland - Wittenoom Road in flood after Tropical Cyclone John in December 1999. Approximate location.
|
|

249-02138 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-03138 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-04131 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-05161 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-06157 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-07151 viewsYule River bridge looking north east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-08134 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-09147 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-10120 viewsYule River bridge south abutment showing the chainage of the railway line. Approximate location.
|
|

249-11144 viewsYule River bridge looking north west downstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-12137 viewsYule River bridge looking north from the bridge deck on the BHP mainline of the sunk track section. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-13131 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-14137 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-15135 viewsTable Hill on the Robe River railway line, a microwave radio communications site powered by solar panels. Approximate location.
|
|

249-16136 viewsTable Hill on the Robe River railway line, looking in a southerly direction as the railway line snakes south towards the Chichester's. Approximate location.
|
|

249-17155 viewsTable Hill on the Robe River railway line, looking in a northerly direction as the railway line snakes north and heads through Lockyer Gap towards Cape Lambert. Following a very wet 1999 cyclone season Lake Poongkaliyarra is very full. Approximate location.
|
|

249-18144 viewsTable Hill on the Robe River railway line, a microwave radio communications site powered by solar panels. Approximate location.
|
|

249-19138 viewsTable Hill on the Robe River railway line, a microwave radio communications site powered by solar panels. Approximate location.
|
|

249-20146 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking south following Cyclone John on 18th December 1999. Approximate location.
|
|
|