|
![Filename=256-01.jpg
Filesize=624KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-01.jpg](albums/Pilbara/256/thumb_256-01.jpg)
256-0129 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|
![Filename=256-02.jpg
Filesize=643KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-02.jpg](albums/Pilbara/256/thumb_256-02.jpg)
256-0225 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|
![Filename=256-03.jpg
Filesize=605KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-03.jpg](albums/Pilbara/256/thumb_256-03.jpg)
256-0325 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|
![Filename=256-04.jpg
Filesize=599KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-04.jpg](albums/Pilbara/256/thumb_256-04.jpg)
256-0436 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|
![Filename=256-05.jpg
Filesize=697KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-05.jpg](albums/Pilbara/256/thumb_256-05.jpg)
256-0523 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.
|
|
![Filename=256-06.jpg
Filesize=712KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-06.jpg](albums/Pilbara/256/thumb_256-06.jpg)
256-0622 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.
|
|
![Filename=256-07.jpg
Filesize=654KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-07.jpg](albums/Pilbara/256/thumb_256-07.jpg)
256-0728 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.
|
|
![Filename=256-08.jpg
Filesize=588KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-08.jpg](albums/Pilbara/256/thumb_256-08.jpg)
256-0834 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|
![Filename=256-09.jpg
Filesize=644KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-09.jpg](albums/Pilbara/256/thumb_256-09.jpg)
256-0925 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|
![Filename=256-10.jpg
Filesize=548KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-10.jpg](albums/Pilbara/256/thumb_256-10.jpg)
256-1030 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|
![Filename=256-11.jpg
Filesize=521KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-11.jpg](albums/Pilbara/256/thumb_256-11.jpg)
256-1124 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|
![Filename=256-12.jpg
Filesize=627KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-12.jpg](albums/Pilbara/256/thumb_256-12.jpg)
256-1228 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|
![Filename=256-13.jpg
Filesize=627KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-13.jpg](albums/Pilbara/256/thumb_256-13.jpg)
256-1324 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|
![Filename=256-14.jpg
Filesize=523KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-14.jpg](albums/Pilbara/256/thumb_256-14.jpg)
256-1423 views89.6 km, Toyota Landcruiser HJ75, waiting for a train. May 2002.
|
|
![Filename=256-15.jpg
Filesize=452KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-15.jpg](albums/Pilbara/256/thumb_256-15.jpg)
256-1530 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|
![Filename=256-16.jpg
Filesize=458KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-16.jpg](albums/Pilbara/256/thumb_256-16.jpg)
256-1627 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|
![Filename=256-17.jpg
Filesize=459KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-17.jpg](albums/Pilbara/256/thumb_256-17.jpg)
256-1733 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|
![Filename=256-18.jpg
Filesize=528KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-18.jpg](albums/Pilbara/256/thumb_256-18.jpg)
256-1830 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|
![Filename=256-19.jpg
Filesize=510KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-19.jpg](albums/Pilbara/256/thumb_256-19.jpg)
256-1933 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|
![Filename=256-20.jpg
Filesize=610KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-20.jpg](albums/Pilbara/256/thumb_256-20.jpg)
256-2030 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|
|