Last additions - BHP_Rolling_Stock_-_Non_Ore |

6703 Mt Newman Mining Workshops 060429 3745446 viewsFlash Butt yard, Pony re-laying waggon 6703 is a heavily cut down and modified Magor USA ore waggon done by Mt Newman Mining workshops, converted to a 50 tonne flat waggon.Mar 09, 2017
|
|

060429 3744410 viewsFlash Butt yard, Pony re-laying flat waggon, in service as a transport waggon for a gantry car and sleepers. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.Mar 09, 2017
|
|

9001 Scotts of Ipswich Qld 060429 3743426 viewsFlash Butt yard, Pony waggon 9001, originally built by Scotts of Ipswich Qld as a box car or covered van in December 1971, heavily modified and converted for Pony traffic.Mar 09, 2017
|
|

6704 060429 3742397 viewsFlash Butt yard, Pony re-laying waggon 6704 flat waggon, unsure of history or who built it or where it came from, it looks to be heavy duty with riveted side frames and an odd handbrake arrangement.Mar 09, 2017
|
|

6702 Mt Newman Mining Workshops 060429 3741440 viewsFlash Butt yard, Pony re-laying waggon 6702 is a heavily cut down and modified Magor USA ore waggon done by Mt Newman Mining workshops, converted to a 50 tonne flat waggon.Mar 09, 2017
|
|

6704 060429 3740420 viewsFlash Butt yard, Pony re-laying waggon 6704 flat waggon, unsure of history or who built it or where it came from, it looks to be heavy duty with riveted side frames and an odd handbrake arrangement.Mar 09, 2017
|
|

6001 Tomlinson Steel 060429 3739422 viewsFlash Butt yard, Pony re-laying waggon, 6001 originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966 of which three were sold to Mt Newman Mining in 1967 and numbered 6001-6003.Mar 09, 2017
|
|

060429 3738430 viewsFlash Butt yard, Pony re-laying waggon, #1, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.Mar 09, 2017
|
|

6002 Tomlinson Steel 060429 3737409 viewsFlash Butt yard, Pony re-laying waggon, 6002 originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966 of which three were sold to Mt Newman Mining in 1967 and numbered 6001-6003.Mar 09, 2017
|
|

6001 Tomlinson Steel 060429 3736415 viewsFlash Butt yard, Pony re-laying waggon, 6001 originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966 of which three were sold to Mt Newman Mining in 1967 and numbered 6001-6003.Mar 09, 2017
|
|

6002 Tomlinson Steel 060429 3735417 viewsFlash Butt yard, Pony re-laying waggon, 6002 originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966 of which three were sold to Mt Newman Mining in 1967 and numbered 6001-6003.Mar 09, 2017
|
|

060429 3734455 viewsFlash Butt yard, Pony re-laying waggon, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.Mar 09, 2017
|
|

6017 Comeng WA 060429 3733448 viewsFlash Butt yard, Pony waggon 6017, built by Comeng WA in 1971 in a batch of three numbered 6014-6017, view of asset number 6506-017.Mar 09, 2017
|
|

6017 Comeng WA 060429 3732423 viewsFlash Butt yard, Pony waggon 6017, built by Comeng WA in 1971 in a batch of three numbered 6014-6017, with asset number 6506-017.Mar 09, 2017
|
|

6017 Comeng WA 060429 3731428 viewsFlash Butt yard, Pony waggon 6017, built by Comeng WA in 1971 in a batch of three numbered 6014-6017, with asset number 6506-017, view of builders plate.Mar 09, 2017
|
|

060429 3730419 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining, builders plate for Scotts of Ipswich Qld with a 24th September 1970 build date, one of nine originally numbered 6005-6013.Mar 09, 2017
|
|

060429 3729437 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining on the 24th September 1970 by Scotts of Ipswich, one of a batch of nine, one of a batch of nine in the series 6005-6013.Mar 09, 2017
|
|

060429 3728404 viewsFlash Butt yard, Pony re-laying waggon, #2, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.Mar 09, 2017
|
|

060429 3727417 viewsFlash Butt yard, Pony re-laying waggon, builders plate of Mt Newman Mining waggon built in 1970 by Scotts of Ipswich, one of a batch of nine in the series 6005-6013.Mar 09, 2017
|
|

060429 3726388 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining in 1970 by Scotts of Ipswich, one of a batch of nine, one of a batch of nine in the series 6005-6013.Mar 09, 2017
|
|
| 822 files on 42 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |