Most viewed - 0220 |

220-09285 viewsHills around former Shay Gap mining area.
|
|

220-08278 viewsRubin Junction looking north from the Nimingarra Mine end of the triangle, the track to the left leads to Yarrie and the track to the right to Hedland.
|
|

220-16277 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|

220-02275 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking east past the point indicators and the 136 km post.
|
|

220-19272 viewsTomlinson Steel WA built bottom discharge ore waggon 8115 loaded in the consist of a Yarrie train.
|
|

220-11271 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, looking towards Yarrie.
|
|

220-01269 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking east from the 135 km post.
|
|

220-05269 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking west past the Yard Limit sign and the 137.5 km grade crossing.
|
|

220-15269 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|

220-03267 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking west at the points, indicator and shelter located at the 136 km or Hedland end.
|
|

220-07266 viewsRubin Junction looking west from the eastern end, the line off to the right is the line to Nimingarra Mine with the straight continuing onto Hedland.
|
|

220-13258 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|

220-14258 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|

220-17257 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|

220-10256 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, looking towards Hedland.
|
|

220-30252 viewsGoldsworthy Junction, the afternoon empty departure for Yandi mine behind the standard double Dash 8 power consist of 5649 'Pohang' a Goninan GE rebuild CM40-8M model serial 8412-07 / 93-140 and a sister unit, the line merging from the right is the former Goldsworthy line from Yarrie and Nimingarra mines. This area is now fully duplicated with LED signals and the Dash 8 units have been scrapped.
|
|

220-18249 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|

220-20247 viewsGoldsworthy Junction, looking north east along the Goldsworthy line as a loaded train ex Yarrie mine approaches rounding the curve, the grease pot for the curve behind the photographer is visible.
|
|

220-12244 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, hills, Toyota HJ75 Landcruiser.
|
|

220-35243 viewsGoldsworthy Junction, empty train with the trailing loco a Goninan GE rebuild CM40-8ML model 5664 'Kaohsiung' serial 8412-09 / 94-155 was originally rebuilt without a driving cab for use as a LocoTrol II controlling remote, then one was retrofitted following improvements in the size of the required LocoTrol equipment and for operational purposes. Seen here as the trailing remote during a period of trials on Yandi trains where the consist was two leads units, 112 waggons, one loco, 112 waggons and the final loco.
|
|
|