Most viewed - 030415 |

030415 0659111093 viewsKevin, originally one of sixty two Kinki Sharyo built NH type for the NAR in 1966, sent to Eyre Peninsula in 1985 and recoded to ENH type, ENH 11 with hungry boards fitted and loaded with gypsum on train 3DD2 at the Kevin loading point.
|
|

030415 065944999 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit NJ 6 serial 71-733, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|

030415 070420981 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit serial 71-732, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|

030415 065924980 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|

030415 070408962 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. In the background are the old loading bins. At the Kevin loading point.
|
|

030415 071146837 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|

030415 070041774 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit serial 71-732, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|

030415 071138761 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.
|
|

030415 065601755 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units NJ 5 serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.
|
|

030415 065626712 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units NJ 5 serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.
|
|
|
|
|
|