Most viewed - 060111 |

060111 2257432 viewsTooligie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 and its grain train. 11th January 2006.
|
|

060111 2385363 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
|
|

060111 2321358 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2295354 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
|
|

060111 2322349 viewsWarramboo, located at the 190.2 km with now disused station building on the left, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 shunts empty grain waggons into the grain loop for loading. 11th January 2006.
|
|

060111 2411347 viewsWudinna, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004, 1203 and two ALCo units 850 and 905 shunt back down the mainline at Wudinna as they run round their consist. 11th January 2006.
|
|

060111 2399334 viewsWudinna, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427 is one of fourteen originally built between 1960-65 for WAGR as A class, A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, it started working on the Eyre Peninsula in November 2004, here it and two ALCo units 850 and 905 have arrived on the grain loop and are about to run round the consist. 11th January 2006.
|
|

060111 2256305 viewsTooligie, a kilometre south with empty grain train ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
|
|

060111 2245304 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
|
|

060111 2259303 viewsTooligie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 and its grain train. 11th January 2006.
|
|

060111 2255302 viewsTooligie, a kilometre south with empty grain train ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
|
|

060111 2258295 viewsTooligie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 and its grain train. 11th January 2006.
|
|

060111 2249293 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
|
|

060111 2400282 viewsWudinna, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004, shunts through the yard.
|
|

060111 2247280 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
|
|

060111 2254280 viewsTooligie, a kilometre south with empty grain train ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
|
|

060111 2413279 viewsWudinna, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004, 1203 and two ALCo units 850 and 905 shunt back down the mainline at Wudinna as they run round their consist. 11th January 2006.
|
|

060111 2262276 viewsTooligie, 830 class unit 850 serial 84136 an AE Goodwin built ALCo DL531 model for the SAR and delivered new to Port Lincoln in 1962. 11th January 2006.
|
|

060111 2250275 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
|
|

060111 2248269 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
|
|
|